arbitration or other dispute resolution costs ) 1 . all persons on the Site or who may
<br /> arising out of or relating to any claim or action , be affected by the Work ;
<br /> legal or equitable , brought by any such owner
<br /> or occupant against OWNER , ENGINEER, or 2 . all the Work and materials and equip-
<br /> any other party indemnified hereunder to the ment to be incorporated therein , whether in
<br /> extent caused by or based upon storage on or off the Site ; and
<br /> CONTRACTOR's performance of the Work .
<br /> 3 . other property at the Site or adjacent
<br /> B . Removal of Debris During Performance of the thereto , including trees , shrubs , lawns , walks ,
<br /> Work: During the progress of the Work CONTRAC- pavements , roadways , structures , utilities , and
<br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for
<br /> accumulations of waste materials , rubbish , and other removal , relocation , or replacement in the
<br /> debris . Removal and disposal of such waste materi- course of construction .
<br /> als , rubbish , and other debris shall conform to applica-
<br /> ble Laws and Regulations . B . CONTRACTOR shall comply with all applica-
<br /> ble Laws and Regulations relating to the safety of
<br /> C . Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or
<br /> the Work CONTRACTOR shall clean the Site and property from damage , injury, or loss ; and shall erect
<br /> make it ready for utilization by OWNER . At the com - and maintain all necessary safeguards for such safety
<br /> pletion of the Work CONTRACTOR shall remove from and protection . CONTRACTOR shall notify owners of
<br /> the Site all tools , appliances , construction equipment adjacent property and of Underground Facilities and
<br /> and machinery, and surplus materials and shall other utility owners when prosecution of the Work may
<br /> restore to original condition all property not designated affect them , and shall cooperate with them in
<br /> the
<br /> for alteration by the Contract Documents . protection , removal , relocation , and replacement of
<br /> their property. All damage , injury, or loss to any
<br /> D . Loading Structures: CONTRACTOR shall not property referred to in paragraph 6 . 13 .A . 2 or 6 . 13 .A . 3
<br /> load nor permit any part of any structure to be loaded caused , directly or indirectly, in whole or in
<br /> part, by
<br /> in any manner that will endanger the structure , nor CONTRACTOR, any Subcontractor, Supplier, or any
<br /> shall CONTRACTOR subject any part of the Work or other individual or entity directly or indirectly employed
<br /> adjacent property to stresses or pressures that will by any of them to perform any of the Work , or
<br /> anyone
<br /> endanger it . for whose acts any of them may be liable , shall be
<br /> remedied by CONTRACTOR (except damage or loss
<br /> 6 . 12 Record Documents attributable to the fault of Drawings or Specifications
<br /> or to the acts or omissions of OWNER or ENGINEER
<br /> A . CONTRACTOR shall maintain in a safe place or ENGINEER' s Consultant , or anyone employed by
<br /> at the Site one record copy of all Drawings , Specifica- any of them , or anyone for whose acts any of
<br /> them
<br /> tions , Addenda , Written Amendments , Change may be liable , and not attributable , directly or
<br /> Orders , Work Change Directives , Field Orders , and indirectly, in whole or in part , to the fault or
<br /> negligence
<br /> written interpretations and clarifications in good order of CONTRACTOR or any Subcontractor, Supplier, or
<br /> and annotated to show changes made during other individual or entity directly or indirectly employed
<br /> construction . These record documents together with by any of them ) . CONTRACTOR's duties and
<br /> all approved Samples and a counterpart of all responsibilities for safety and for protection of the
<br /> approved Shop Drawings will be available to ENGI - Work shall continue until such time as all the Work
<br /> is
<br /> NEER for reference . Upon completion of the Work, completed and ENGINEER has issued a notice to
<br /> these record documents , Samples , and Shop OWNER and CONTRACTOR in accordance with
<br /> Drawings will be delivered to ENGINEER for OWNER . paragraph 14 . 07 . 6 that the Work is acceptable
<br /> (except as otherwise expressly provided in connection
<br /> 6 . 13 Safety and Protection with Substantial Completion ) .
<br /> A . CONTRACTOR shall be solely responsible 6 . 14 Safety Representative
<br /> for initiating , maintaining and supervising all safety
<br /> precautions and programs in connection with the A. CONTRACTOR shall designate a qualified
<br /> Work . CONTRACTOR shall take all necessary and experienced safety representative at the Site
<br /> precautions for the safety of, and shall provide the whose duties and responsibilities shall be the
<br /> necessary protection to prevent damage , injury or loss prevention of accidents and the maintaining and
<br /> to : supervising of safety precautions and programs .
<br /> 00700 - General Conditions REV 04-07. doc
<br /> 00700 - 23
<br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\00700 - General Conditions REV 04-07.doc
<br />
|