Laserfiche WebLink
SECTION 01024 <br /> FORCE ACCOUNT <br /> 1 . 1 General <br /> CONTRACTOR shall furnish all labor , materials , equipment and incidentals <br /> necessary to perform additional work not covered on the Contract Drawings , The <br /> Force Account is intended as a contingency for unforeseen work . <br /> 1_2 PAYMENT <br /> A . Lump sum amount for Force Account work is included in the bid schedule . <br /> The value of Force Account work will be determined in accordance with <br /> Article 12 of the General Conditions . <br /> + + END OF SECTION + + <br /> 01024- 1 <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01024 - Force <br /> Account. doc <br />