Laserfiche WebLink
progresses . Control delivery schedules so as to minimize unnecessary long -term <br /> storage at the project site prior to installation . <br /> 1 . 5 PROJECT PHOTOGRAPHS /VIDEOS <br /> A . The CONTRACTOR shall make provisions , at his expense , for video tapes of <br /> all work areas just prior to construction , and for unusual conditions during <br /> construction . The videos shall show pertinent physical features along the line of <br /> construction . The purpose of the videos is to determine any damage to private <br /> or public property during construction . <br /> B . Pre- Construction Video : <br /> 1 . Contractor shall provide the Owner with a video record and one copy of the <br /> existing conditions prior to construction . This video shall be a standard VHS <br /> cassette format , and shall be narrated . <br /> 2 . The video shall include , but not be limited to , the following items shown in a <br /> clear manner : <br /> a) All existing features within the right- of-way . <br /> b) All existing features within the temporary construction easement . <br /> c) All existing features within permanent easements . <br /> d) All existing features adjacent to any construction . <br /> 3 . Detail of the video shall be such that the following examples shall be clear <br /> and visible : <br /> a) Cracks in walls . <br /> b) Condition of fencing . <br /> c) Condition of planted areas and types of vegetation . <br /> d) Condition of sodded areas . <br /> e) Conditions of sprinkler systems and associated controls and wiring . <br /> f) Condition of signs . <br /> g) Conditions of lighting and associated wiring . <br /> h) Significant detail of any pre - existing damages physical features shall be <br /> i shown . The coverage of the video should include the limits of effects of <br /> the use of vibratory rollers . <br /> i ) This video record shall be presented to the Owner within 30 days of the <br /> Notice to Proceed . A copy shall be kept in the Contractor' s field office . <br /> j ) Payment — No additional payment will be made for this work . <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01215 - General <br /> Quality . doc <br />