My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1 . 4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but the <br /> CONTRACTOR shall provide inspection of work area daily and shall take whatever <br /> measures are necessary to protect the safety of the public , workmen , and materials , <br /> and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work of this <br /> Contract . In dry weather , spray dusty areas daily with water in order to control dust . <br /> Take necessary steps to prevent the tracking of mud onto adjacent streets and <br /> highways . <br /> 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally dispose of <br /> them as soon as the work is complete . The areas of the site used for temporary <br /> facilities shall be properly reconditioned and restored to a condition acceptable to the <br /> OWNER . <br /> + + END OF SECTION + + <br /> 01520-2 <br /> F :\Engineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01520 - <br /> Construction Facilities . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.