Laserfiche WebLink
Drawings are located according to the information available to the <br /> ENGINEER at the time the Drawings were prepared and have not <br /> been independently verified by the OWNER or the ENGINEER . <br /> Guarantee is not made that all existing underground utilities are shown <br /> or that the locations of those shown are accurate . The locations shown <br /> are for bidding purposes only . Finding the actual location of any <br /> existing utilities is the CONTRACTOR' s responsibility and shall be <br /> done before it commences any work in the vicinity . Furthermore , the <br /> CONTRACTOR shall be fully responsible for any and all damages , <br /> which might be occasioned by the CONTRACTOR' s failure to exactly <br /> locate and preserve any and all underground utilities . The OWNER or <br /> ENGINEER will assume no liability for any damages sustained or costs <br /> incurred because of the CONTRACTOR Is operations in the vicinity of <br /> existing utilities or structures , nor for temporary bracing and shoring of <br /> same . If it is necessary to shore , brace , or swing a utility , contact the <br /> utility company or department affected and obtain their permission <br /> regarding the method to use for such work . <br /> 3 . Contact the various utility companies which may have buried or aerial <br /> utilities within or near the construction area before commencing work. <br /> Provide 48 hours minimum notice to all utility companies prior to begin - <br /> ning construction . <br /> 4 . Schedule and execute all work involving existing utilities in order to <br /> minimize necessary interruption of services . Whenever such <br /> interruption is necessary for completion of the work , notify the <br /> ENGINEER and the appropriate utility at least 48 hours in advance . <br /> Perform all work to repair/ restore utility service to the satisfaction of the <br /> appropriate utility . Include all costs related to service maintenance , <br /> interruption , and restoration in the appropriate line item in the Contract . <br /> 5 . Where it is necessary to temporarily interrupt house or business <br /> services , the CONTRACTOR shall notify the owner or occupant , both <br /> before the interruption ( 24 - hour minimum ) , and again immediately <br /> before service is resumed . Before disconnecting and pipes or cables , <br /> the CONTRACTOR shall obtain permission from their owner , or shall <br /> make suitable arrangement for their disconnection by their owner . <br /> 6 . Explore ahead of trenching and excavation work and uncover all <br /> obstructing underground structures sufficiently to determine their <br /> location , to prevent damage to them and to prevent interruption of the <br /> services which such structures provide . If CONTRACTOR damages an <br /> underground structure , restore it to .original condition at <br /> CONTRACTOR' s expense . <br /> 7 . Necessary changes in the location of the Work may be made by <br /> ENGINEER , to avoid unanticipated underground structures . <br /> 8 . If permanent relocation of an underground structure or other <br /> subsurface facility is required and is not otherwise provided for in the <br /> Contract Documents , ENGINEER will direct CONTRACTOR in writing <br /> to perform the Work , which shall be paid for under the provisions of <br /> Article 11 of the General Conditions . <br /> 01541 -3 F :\Engineering\Special Projects\Enclave <br /> Subdivision\Contract Documents\Contract Documents\The Enclave . doc\01541 - Protection of Property .doc <br />