establish the standards by which such portion of the
<br /> Work will be judged . 47 . Unit Price Work--Work to be paid for on
<br /> the basis of unit prices .
<br /> 39 . Shop Drawings--All drawings , diagrams ,
<br /> illustrations , schedules , and other data or information 48 . Work--The entire completed construction
<br /> which are specifically prepared or assembled by or for or the various separately identifiable parts thereof re-
<br /> CONTRACTOR and submitted by CONTRACTOR to quired to be provided under the Contract Documents .
<br /> illustrate some portion of the Work . Work includes and is the result of performing or
<br /> providing all labor, services , and documentation
<br /> 40 . Site--Lands or areas indicated in the necessary to produce such construction , and
<br /> Contract Documents as being furnished by OWNER furnishing , installing , and incorporating all materials
<br /> upon which the Work is to be performed , including and equipment into such construction , all as required
<br /> rights-of-way and easements for access thereto , and by the Contract Documents .
<br /> such other lands furnished by OWNER which are
<br /> designated for the use of CONTRACTOR . 49 . . Work Change Directive--A written
<br /> statement to CONTRACTOR issued on or . after the
<br /> 41 . Specifications--That part of the Contract Effective Date of the Agreement and signed by
<br /> Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering
<br /> of materials , equipment , systems , standards , and an addition , deletion , or revision in the Work , or
<br /> workmanship as applied to the Work and certain responding to differing or unforeseen subsurface
<br /> or
<br /> administrative details applicable thereto . physical conditions under which the Work is to be
<br /> performed or to emergencies . A Work Change
<br /> 42 . Subcontractor--An individual or entity Directive will not change the Contract Price or the
<br /> having a direct contract with CONTRACTOR or with Contract Times but is evidence that the parties expect
<br /> any other Subcontractor for the performance of a part that the change ordered or documented by a Work
<br /> of the Work at the Site . Change Directive will be incorporated in a subse-
<br /> quently issued Change Order following negotiations by
<br /> 43 . Substantial Completion--The time at the parties as to its effect, if any, on the Contract Price
<br /> which the Work ( or a specified part thereof) has or Contract Times .
<br /> progressed to the point where , in the opinion of
<br /> ENGINEER , the Work (or a specified part thereof) is 50 . Written Amendment--A written statement
<br /> sufficiently complete , in accordance with the Contract modifying the Contract Documents , signed by
<br /> Documents , so that the Work (or a specified part OWNER and CONTRACTOR on or after the Effective
<br /> thereof) can be utilized for the purposes for which it is Date of the Agreement and normally dealing with the
<br /> intended . The terms "substantially complete" and nonengineering or nontechnical rather than strictly
<br /> " substantially completed " as applied to all or part of the construction-related aspects of the Contract Docu -
<br /> Work refer to Substantial Completion thereof. ments .
<br /> 44 . Supplementary Conditions--That part of 1 . 02 Terminology
<br /> the Contract Documents which amends or
<br /> supplements these General Conditions . A. Intent of Certain Terms or Adjectives
<br /> 45 . Supplier--A manufacturer, fabricator, 1 . Whenever in the Contract Documents the
<br /> supplier, distributor, materialman , or vendor having a terms " as allowed , " " as approved , " or terms of like
<br /> direct contract with CONTRACTOR or with any effect or import are used , or the adjectives
<br /> Subcontractor to furnish materials or equipment to be " reasonable , " " suitable , " " acceptable , " " proper, "
<br /> incorporated in the Work by CONTRACTOR or any " satisfactory, " or adjectives of like effect or import
<br /> Subcontractor. are used to describe an action or determination of
<br /> ENGINEER as to the Work , it is intended that such
<br /> 46 . Underground Facilities--All underground action or determination will be solely to evaluate , in
<br /> pipelines , conduits , ducts , cables , wires , manholes , general , the completed Work for compliance with
<br /> vaults , tanks , tunnels , or other such facilities or the requirements of and information in the Contract
<br /> attachments , and any encasements containing such Documents and conformance with the design
<br /> facilities , including those that convey electricity, gases , concept of the completed Project as a functioning
<br /> steam , liquid petroleum products , telephone or other whole as shown or indicated in the Contract
<br /> communications , cable television , water, wastewater, Documents ( unless there is a specific statement
<br /> storm water, other liquids or chemicals , or traffic or indicating otherwise) . The use of any such term
<br /> or
<br /> other control systems . adjective shall not be effective to assign to ENGI-
<br /> 00700 - General Conditions REV 04-07 .doc
<br /> 00700 - 7
<br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave.do600700 - General Conditions REV 04-07.doc
<br />
|