My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-417A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-417A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 9:58:52 AM
Creation date
10/1/2015 1:11:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2008
Control Number
2008-417A
Agenda Item Number
8.H.
Entity Name
Sheltra & Son Construction
Subject
Enclave Subdivision Contract, Specifications
Area
The Enclave Subdivision
Project Number
0816
Bid Number
2009019
Supplemental fields
SmeadsoftID
8214
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR ' S CERTIFICATION AS TO ACCURACY OF RECORD DRAWINGS : <br /> I HEREBY CERTIFY that to the best of my knowledge and belief, these Project Record <br /> Drawings are complete and accurate and correctly represent the constructed Work for this <br /> project . <br /> Contractor : Date : <br /> Contractor' s License Number : <br /> SURVEYOR ' S CERTIFICATION AS TO ACCURACY OF RECORD DRAWINGS : <br /> I HEREBY CERTIFY that to the best of my knowledge and belief, the land surveying <br /> information shown on these Project Record Drawings is complete and correctly represents <br /> the constructed Work for this project . I FURTHER CERTIFY that this survey work was <br /> performed by me personally or performed by individuals under my direct control and <br /> supervision . I ALSO CERTIFY that all the survey work for these Project Record Drawings <br /> meets all state laws and regulations regarding Land Surveyors and Mappers . <br /> Professional Surveyor and Mapper : <br /> Printed Name : <br /> Date : ( SEAL ) <br /> License Number : <br /> 1 . 4 SPECIFICATIONS AND ADDENDA <br /> A . Legibly mark up each Section to record : <br /> a . Manufacturer , trade name , catalog number , and supplier of each product and <br /> item of equipment actually installed . <br /> b . Changes made by Change Order or Field Order . <br /> c . Other matters not originally specified . <br /> 1 . 5 SUBMITTAL OF RECORD DOCUMENTS <br /> A . Deliver record documents to OWNER . Final payment will not be made until <br /> ENGINEER receives satisfactory record documents . <br /> B . Accompany submittal with transmittal letter containing : <br /> a . Date . <br /> b . Project title and number . <br /> c . CONTRACTOR' S name and address . <br /> d . Title and number of each record document . <br /> e . Certification that each document as submitted is complete and accurate . <br /> f. Signature of CONTRACTOR , or his authorized representative . <br /> 01720 - Record Documents . doc <br /> 01720 - 3 <br /> FAEngineering\Special Projects\Enclave Subdivision\Contract Documents\Contract Documents\The Enclave .doc\01720 - Record Documents .doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.