My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-143
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 1:52:00 PM
Creation date
9/30/2015 6:36:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/24/2003
Control Number
2003-143
Agenda Item Number
7.Z.
Entity Name
TLC Engineering
Subject
Sheriff's Administration HVAC Replacement
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittals : <br /> All work will on AutoCAD (2000) generated drawings <br /> Written specifications will provided and shall be include as a separate package. <br /> TLC will submit, For bidding purposes, 10 sets of final blueline drawings and specifications of the <br /> of proposed Division 15 and 16 work. <br /> Two (2) sets of review check prints at approximately 75 % design ( 11 "x 17"prints) . <br /> One ( 1 ) copy of all final drawings on electronic media (Auto CAD 2000) . <br /> Design Meetings <br /> One meeting at the 75 % design phase is included . <br /> Additional Service <br /> Additional services may be included: <br /> Additional designs meeting <br /> Expanded scope beyond proposal constraints <br /> Additional HVAC or electrical work beyond this scope <br /> This agreement may be modified by written addendum to include additional work. The addendum shall <br /> include the negotiated fee based upon the attached fee schedule ( Schedule A) and the amended scope of <br /> work. <br /> ENGINEER, as an independent ENGINEER and not as an employee of the COUNTY, shall furnish, for <br /> the sum of Thirty nine thousand five hundred dollars and no cents ($39, 500) , all of the necessary labor, <br /> material, and equipment to perform the work described in accordance with the Contract Documents . <br /> Article 2 . TIME OF COMPLETION <br /> All construction documents shall be completed within : <br /> 120 Days from receipt of the Notice to Proceed . <br /> Article 3 . GENERAL <br /> The ENGINEER hereby certifies that he has read every clause of the Contract Documents and that he has <br /> made such examination of the location of the proposed work as is necessary to understand fully the nature <br /> of the obligation herein made; and shall complete the same in the time limit specified herein in accordance <br /> with the REQUEST FOR PROPOSAL #5022 . <br /> The OWNER and ENGINEER agree to maintain records, invoices, and payments for the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.