My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/9/1966
CBCC
>
Meetings
>
1960's
>
1966
>
3/9/1966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 10:02:15 AM
Creation date
6/10/2015 10:50:46 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/09/1966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION <br />WHEREAS, the State Road Department of the State of Florida, Is <br />.now in the process of preparing its budget for the fiscal year 1966--1907: <br />and, <br />WHEREAS, the Board of County Commissioners of Indian River County, <br />Florida, i vitally interested in the additions, extensions and improvements <br />to the primary road system of the State of Florida in Indian River County, <br />Florida: NOW, THEREFORE: <br />BE IT RESOLVED by the Board of County Co atissioners of Indian River <br />County, Florida, that this Board does herewith respectfully request the <br />State Road Department of the State of Florida to include in its budget for <br />primary roads for the fiscal year 1966-1967 the following projects in <br />Indian River County, Florida. <br />1. Preliminary engineering design and right of way map for <br />SR 60 from the FRC Railroad to the west county line. If <br />necessary, hire private consultant in order for the County <br />to begin right of way purchas <br />2. The reconstruction of the existing bridge on SR 512 approx- <br />imately 0.5 mile east of the intersection of SR 510. <br />3. The construction of an adequate two-lane approach highway <br />to the Wabasso Bridge, SR 510 from U.S. *s (SR 5) to the <br />west shore of the gndiaan River, approximately 0.5 smile. <br />4. Widening and reconstruction of Old Dixie Highway© SR 605 <br />from Glendale Road,. SR 612 to 19th Street, a distance of <br />1.5 miles. <br />5. The extension, widening and construction of SR GO from <br />Indian River Blvd. to the Atlantic Ocean, approximately <br />1.5 miles. <br />6. The reconstruction and improvement of the west portion of <br />the . Wabasso ridge from Wabasso Island to the east shore <br />of the Indian River over the Intracoastal Waterway and an <br />adequate two-lane highway from the east shore of the Indian <br />River to State Road AI, being the Wabasso Bridge Road, <br />(SR 510) 1.25 miles. <br />7. A feasibility study for the location and need for an add- <br />itional bridge across the Indian River south of the Merrill <br />P. Barber Bridge. <br />I, Ralph Barris, Clerk of the Circuit Cenzt of Indian River County, <br />Florida, and Clerk of the Board of County Commissioners of Indian River <br />County. Florida, do certify that the foregoing is a true. and correct copy of <br />a resolution adopted at a regular meeting of the Board of County Commissioners <br />of Indian River County, Florida, held on March 9th, 19664;I'd that said <br />resolution stands in full force and effect and has nut;bee .rovoked. <br />WITNESS ;r,:,y hand and official seal this 9 ` J40#00* 0,o: 1966.. <br />BAR 9 1966 <br />
The URL can be used to link to this page
Your browser does not support the video tag.