Laserfiche WebLink
DESCRIPTION OF PROJECT OR USE OF SECONDARY ROAD FUNDS FOR 1966-1967 <br />1. To complete survey and alignment map for Indian River Boulevard <br />from Township line dividing 31 South, and 32 South, to Oslo <br />Read, approximately 10.0 miles. <br />2. Right of way for widening and reconstruction of the Old Dixie <br />Highway from 19th Street to SR 612, approximately 1.5 miles. <br />3. Acquire additional right of way, reconstruct and widen Emerson <br />Avenue, SR 607 from SR 60 to Glendale Road, SR 612, approximately <br />1.5 miles. <br />4. Acquire additional right of way, reconstruct and widen Clemanns <br />Avenue, SR 611, from SR 60 to Glendale Road, SR 612, approximately <br />1.5 miles. <br />5. Widen to 24' and resurface West Wabasso Road, SR 510 from its <br />intersection with SR 512 south and east a distance of 1.75 miles. <br />6. Widen to 24' and resurface Zings Highway, SR 505A from SR 60 to <br />the North Relief Canal a distance of 3.75 miles. <br />7. Ranch Road, SR 609, from Barber Avenue to North Winter Beach <br />Road, approximately 4 rides. <br />8. Rework base, widen and resurface Lateral A, SR 505, from South <br />Gifford Road, SR 630, to SR 600 approximately 2 miles. <br />9. Glendale Road, SR 612, from one mile west of Rings Highway SR <br />505A to Ditch D-4 (or 90th Avenue) , approximately 3 miles. <br />10. Pave Oslo Road from Ranch Road to 90th Avenue, approximately <br />1 mile.. <br />11. Clemanns Avenue, SR 611, from SR 60 to Walker Avenue including <br />bridge over Nain,Canal, approximately 0.5 mile. <br />12. Citrus Road (4th Street) from Clemanns Avenue, SR 611, to Rings <br />Highway, SR 505A, approximately 1 anile. <br />BOOK <br />9 PACE552 <br />MAR 9 1966 <br />