Laserfiche WebLink
Dec 21 04 12 : 42p Total Golf 772 562 2773 p . l <br /> SITE WEItKS , INC . <br /> FAX <br /> To: Michelle Gentile From: Jeff Brewster <br /> Firm: Indian River County Pages: 2 <br /> Fax: 778-9391 Date: 12/21 /04 <br /> Re: Pelican Island - Excavation CC: <br /> ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply EI Please Recycle <br /> • In regards to the extra excavation work/stockpile material discussed at our <br /> meeting today : <br /> Based on the following we request a change order be issued to us for the following <br /> additional excavation and stockpile material associated with the variations in <br /> topographical data: <br /> 1 . Excavation work ---- 10, 229 Cy at $ 1 . 29 = 139195 .41 <br /> 2 . Transport and Stockpile Excavated Material ---- 109229 CY at $ 1 . 80 = 18,412 .20 <br /> Total additional work is $ 317607. 61 <br /> The above quantity is calculated as follows : <br /> Work area 493 , 188 SF / 27 x 1 foot elevation deviation = 18,266 CY <br /> 18,266 CY x 56% of area for beds and 44% for furrows = 10,229 CY <br /> Additional stockpile quantity as calculated by the surveyors is shown on the as-built <br /> drawings . <br /> • In reference to the standing up of the trees, please see the attached spreadsheet <br /> regarding staff hours. The deduct for work not performed is $ 10, 332 . 60 <br /> if you require any additional information please let us know. <br /> Sincerely, <br /> Jeff Brewster <br /> Vice President <br /> rd <br /> 4045 43 Avenue - Vero Beach, FL 32960 Phone 772 564-8281 * Fax 772 562-2773 <br />