My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-130
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 4:24:41 PM
Creation date
9/30/2015 6:35:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
06/03/2003
Control Number
2003-130
Agenda Item Number
11.H.3.
Entity Name
Post, Buckley, Schuh & Jernigan, Inc.
Subject
Continuing consulting services for wasewater treatment plants
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3264
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a t <br /> ATTACHMENT A <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> SOUTH WASTEWATER TREATMENT FACILITY <br /> ODOR CONTROL IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> I . PROJECT DESCRIPTION <br /> The objective of this project is to implement certain odor control improvements at the Indian <br /> River County ( IRC ) South WWTF . The basis for odor control improvements at the South <br /> WWTF will be indirect inference from the Central WWTF Odor Control Study and <br /> engineering judgment by IRC staff and PBS&J , absent any site specific testing for <br /> concentrations of mass emissions of odor compounds . PBS &J did conduct a site visit of <br /> both the South WWTF in April 2002 to observe the areas of potential odor emissions . For <br /> the purposes of preparing a scope of work , schedule and budget for this project , it is <br /> assumed that the design and permitting will be performed concurrently with , and in addition <br /> to , the Central WWTF and Regional Sludge Facility ( RSF ) project and that construction of <br /> odor improvements at the Central WWTF , RSF & the South WWTF will be performed via a <br /> single construction contract . <br /> II . SCOPE OF SERVICES <br /> The specific services and tasks to be provided by PBS &J are described as follows : <br /> Task 1 - Consultation with IRC Staff for County Implementation of Certain Odor <br /> Improvements <br /> Certain odor improvements are to be implemented via quotes from existing County <br /> contractors to IRC staff. PBS &J will support this effort by providing telephone consultation , <br /> periodic site visits , sketches , abbreviated technical specifications , and other technical <br /> support as detailed in the following tasks . <br /> It is understood from IRC staff that the following improvements described in PBS &J 's Odor <br /> Control Study have already been completed (or will be completed by IRC staff) and do not <br /> require further assistance from PBS&J : <br /> 0 Addition of gaskets on the headworks structure for the South WWTF <br /> CAF/bw/C:\Documents and Settings\ct7137\Loca1 Settings\Temporary Internet Files\OLK9F\ATTACHMENT A TO South WWTF Scope 3-25-03.doc <br /> Last Revised 5/4/2003 9: 04 AM <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.