My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-130
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 4:24:41 PM
Creation date
9/30/2015 6:35:26 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> SOUTH WASTEWATER TREATMENT FACILITY <br /> ODOR CONTROL IMPROVEMENTS <br /> SCOPE OF SERVICES (Continued) <br /> Task 2 . 5 = Cost Estimating <br /> PBS &J will prepare estimates of probable construction cost to be submitted with the 60 % , <br /> 90 % and bid documents . <br /> Task 2 . 6 - County Reviews <br /> PBS &J will include up to 5 sets of progress contract documents at approximately the 60 % <br /> and 90 % levels of completion in the review sets for the Central WWTF & RSF Odor <br /> improvement project . <br /> Task 3 = Geotechnical Evaluation <br /> The scope of the work will include drilling two (2 ) Standard Penetration Test ( SPT) borings <br /> in general accordance with ASTM D 1586 . One boring will be near the proposed biofilter <br /> and one will be at the location of the proposed South WWTF aerobic digester scrubber. <br /> Task 4 = Permitting <br /> PBS &J will prepare a permit application on behalf of IRC staff for a County building permit <br /> for the South WWTF site . PBS &J has also budgeted to respond to one request for additional <br /> information . <br /> Task 5 = Bidding Phase Services <br /> Task 5 . 1 - Document Distribution and Pre-Bid Meeting <br /> A reproducible copy of the final construction Contract Documents will be provided to IRC <br /> staff to be included with the Central WWTF & RSF Odor project . IRC staff will make all <br /> necessary copies and will distribute same to all bidders without assistance from PBS &J . <br /> Task 6 = Construction Services <br /> General <br /> Once authorized by IRC staff, PBS&J will proceed with the construction phase services <br /> described below by specific tasks to supplement the effort already budgeted for the Central <br /> CAF/bw/C:\Documents and Settings\ct7137\Loca1 Swings\Temporary Intemet Files\OLKWATTACHMENT A TO South WWTF Scope 3-25-03.doc <br /> Last Revised 5/4/2003 9:04 AM <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.