My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMOPY <br /> SECTION 00310 <br /> BID FORM <br /> ' (Based Upon EJCDC No . 1910 - 18 , 1996 Ed .) <br /> PROJECT IDENTIFICATION : South R . O . WTP Clearwell Addition Post Treatment <br /> Modifications , and FRP Piping Replacement <br /> THIS BID IS SUBMITTED TO : Indian River County <br /> 2625 19th Avenue <br /> ' Vero Beach , FL 32960 <br /> The undersigned Bidder proposes and agrees , if this Bid is accepted , to enter into an agreement <br /> with Owner in the form included in the Contract Documents to perform and furnish all work as <br /> specified or indicated in the Contract Documents for the Contract Price and within the Contract <br /> Time indicated in the Contract Documents and in accordance with the other terms and conditions <br /> of the Contract Documents . <br /> ' 2 . Bidder accepts all of the terms and conditions of the Advertisement or Invitation to <br />Bid and <br /> Instructions to Bidders , including without limitation those dealing with the disposition of Bid <br /> Security . This Bid will remain subject to acceptance for sixty days after the day of Bid opening . <br /> ' Bidder will sign and submit the Agreement with the bonds and other documents required by the <br /> Bidding Requirements within ten days after the date of Owner's Notice of Award . <br /> 3 . In submitting this Bid , Bidder represents , as more fully set forth in the Agreement , that : <br /> ' (a) Bidder has examined copies of all the Bidding Documents and of the following Addenda <br /> (receipt of all which is hereby acknowledged ) : <br /> ' Date Number <br /> ' 6 / 19 / 2003 nnP <br /> (b ) Bidder has familiarized itself with the nature and extent of the Contract Documents , the <br /> work, site , locality , and all local conditions and laws and regulations that in any manner <br /> may affect cost, progress , performance or finishing of the work . <br /> t ( c ) Bidder has studied carefully all reports and drawings of subsurface conditions and <br /> drawings of physical conditions which are identified in Paragraph SC -4 . 2 of the <br /> Supplementary Conditions of the extent of the technical data contained in such reports and <br /> drawings upon which Bidder is entitled to rely . <br /> ' (d) Bidder has obtained and carefully studied ( or assumes responsibility for obtaining and <br /> carefully studying) all such examinations , investigations , explorations , tests , reports and <br /> studies (in addition to or to supplement those referred to in (c) above) which pertain to the <br /> ' subsurface or physical conditions at or contiguous to the site or otherwise may affect the <br /> cost , progress , performance or furnishing of the work as Bidder considers necessary for <br /> 044572000 <br /> ' 00310 (A1 ) - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.