' with respect to the Project and who is identified as such in the oil , oil sludge, oil refuse, gasoline, kerosene,
<br /> and oil mixed with
<br /> Supplementary Conditions . other non-Hazardous Waste and crude oils .
<br /> ' 21 . Field Order--A written order issued by ENGI- 34 . Project--The total construction of which the Work
<br /> NEER which requires minor changes in the Work but which to be performed under the Contract Documents may
<br /> be the
<br /> does not involve a change in the Contract Price or the Contract whole, or a part as may be indicated elsewhere in the
<br /> Contract
<br /> Times . Documents .
<br /> ' 22 . General Requirements--Sections of Division 1 of 35. Project Manual--The bound documentary
<br /> the Specifications . The General Requirements pertain to all information prepared for bidding and constructing the Work.
<br /> A
<br /> sections of the Specifications. listing of the contents of the Project Manual , which may be
<br /> bound in one or more volumes , is contained in the table(s ) of
<br /> 23. Hazardous Environmental Condition--The contents.
<br /> presence at the Site of Asbestos , PCBs , Petroleum , Hazardous
<br /> Waste, or Radioactive Material in such quantities or 36. Radioactive Material--Source, special nuclear, or
<br /> ' circumstances that may present a substantial danger to persons byproduct material as defined by the Atomic Energy Act of 1954
<br /> or property exposed thereto in connection with the Work. (42 USC Section 2011 et seq . ) as amended from time to time.
<br /> 24 . Hazardous Waste--The term Hazardous Waste 37 . Resident Project Representative The authorized
<br /> ' shall have the meaning provided in Section 1004 of the Solid representative of ENGINEER who may be assigned to
<br />the Site
<br /> Waste Disposal Act (42 USC Section 6903) as amended from or any part thereof.
<br /> time to time.
<br /> ' 38. Samples--Physical examples of materials ,
<br /> 25. Laws and Regulations; Laws or Regulations--Any equipment, or workmanship that are representative of some
<br /> and all applicable laws , rules , regulations , ordinances , codes , portion of the Work and which establish the standards
<br /> by which
<br /> and orders of any and all governmental bodies , agencies , such portion of the Work will be judged.
<br /> ' authorities , and courts having jurisdiction .
<br /> 39. Shop Drawings--All drawings , diagrams , illustra-
<br /> 26. Liens--Charges , security interests , or tions , schedules , and other data or information which
<br /> are
<br /> encumbrances upon Project funds , real property, or personal specifically prepared or assembled by or for CONTRACTOR
<br /> ' property, and submitted by CONTRACTOR to illustrate some portion of
<br /> the Work.
<br /> 27. Milestone--A principal event specified in the
<br /> Contract Documents relating to an intermediate completion date 40 . Site--Lands or areas indicated in the Contract
<br /> or time prior to Substantial Completion of all the Work. Documents as being furnished by OWNER upon which the
<br /> Work is to be performed , including rights-of-way and easements
<br /> 28. Notice of Award--The written notice by OWNER for access thereto, and such other lands furnished by OWNER
<br /> to the apparent successful bidder stating that upon timely which are designated for the use of CONTRACTOR.
<br /> ' compliance by the apparent successful bidder with the
<br /> conditions precedent listed therein , OWNER will sign and 41 . Specifications--That part of the Contract
<br /> deliver the Agreement. Documents consisting of written technical descriptions of
<br /> materials, equipment, systems , standards , and workmanship as
<br /> t 29. Notice to Proceed--A written notice given by applied to the Work and certain administrative details
<br /> applicable
<br /> OWNER to CONTRACTOR fixing the date on which the Con- thereto.
<br /> tract Times will commence to run and on which CONTRACTOR
<br /> shall start to perform the Work under the Contract Documents . 42. Subcontractor--An individual or entity having a
<br /> ' direct contract with CONTRACTOR or with any other
<br /> 30. OWNER--The individual , entity, public body, or Subcontractor for the performance of a part of the Work at the
<br /> authority with whom CONTRACTOR has entered into the Site.
<br /> Agreement and for whom the Work is to be performed .
<br /> ' 43 . Substantial Completion--The time at which the
<br /> 31 . Partial Utilization--Use by OWNER of a substan- Work (or a specified part thereof) has progressed to the point
<br /> tially completed part of the Work for the purpose for which it is where, in the opinion of ENGINEER , the Work (or
<br /> a specified
<br /> intended (or a related purpose) prior to Substantial Completion part thereof) is sufficiently complete, in accordance
<br /> with the
<br /> ' of all the Work. Contract Documents , so that the Work (or a specified part
<br /> thereof) can be utilized for the purposes for which it is intended .
<br /> 32 . PCBs--Polychlorinated biphenyls . The terms "substantially complete" and "substantially com-
<br /> pleted" as applied to all or part of the Work refer to Substantial
<br /> ' 33 . Petroleum--Petroleum , including crude oil or any Completion thereof.
<br /> fraction thereof which is liquid at standard conditions of
<br /> temperature and pressure (60 degrees Fahrenheit and 14 . 7 44. Supplementary Conditions--That part of the
<br /> pounds per square inch absolute ), such as oil , petroleum , fuel Contract Documents which amends or supplements
<br /> these
<br /> ' General Conditions .
<br /> 044572000
<br /> 00700 - 6
<br />
|