My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' b. with respect to Work that is paid for on a <br /> Unit Price Basis , any adjustment in Contract Price c . coordination of the Work with the owners of <br /> will be subject to the provisions of paragraphs 9 . 08 such Underground Facilities , including OWNER, <br /> ' and 11 . 03 . during construction, and <br /> 2. CONTRACTOR shall not be entitled to any d . the safety and protection of all such Under- <br /> adjustment in the Contract Price or Contract Times if: ground Facilities and repairing any damage thereto <br /> ' a. CONTRACTOR knew of the existence of resulting from the Work. <br /> such conditions at the time CONTRACTOR made a B . Not Shown or Indicated <br /> final commitment to OWNER in respect of Contract <br /> ' Price and Contract Times by the submission of a Bid 1 . If an Underground Facility is uncovered or <br /> or becoming bound under a negotiated contract; or revealed at or contiguous to the Site which was not <br /> shown or indicated , or not shown or indicated with <br /> b. the existence of such condition could reasonable accuracy in the Contract Documents , CON- <br /> reasonably have been discovered or revealed as a TRACTOR shall , promptly after becoming aware thereof <br /> result of any examination , investigation , exploration , and before further disturbing conditions affected thereby <br /> test, or study of the Site and contiguous areas or performing any Work in connection therewith (except <br /> required by the Bidding Requirements or Contract in an emergency as required by paragraph 6. 16.A), <br /> ' Documents to be conducted by or for CON- identify the owner of such Underground Facility and give <br /> TRACTOR prior to CONTRACTOR's making such written notice to that owner and to OWNER and ENGI- <br /> final commitment; or NEER. ENGINEER will promptly review the Under- <br /> ground Facility and determine the extent, if any, to which <br /> ' c. CONTRACTOR failed to give the written a change is required in the Contract Documents <br /> to <br /> notice within the time and as required by paragraph reflect and document the consequences of the existence <br /> 4. 03.A. or location of the Underground Facility. During such <br /> time , CONTRACTOR shall be responsible for the safety <br /> ' 3 . If OWNER and CONTRACTOR are unable to and protection of such Underground Facility. <br /> agree on entitlement to or on the amount or extent, if <br /> any, of any adjustment in the Contract Price or Contract 2. If ENGINEER concludes that a change in the <br /> Times , or both , a Claim may be made therefore as Contract Documents is required , a Work Change <br /> provided in paragraph 10.05. However, OWNER, Directive or a Change Order will be issued to reflect and <br /> ENGINEER, and ENGINEER's Consultants shall not be document such consequences . An equitable <br /> liable to CONTRACTOR for any claims , costs , losses , or adjustment shall be made in the Contract Price of <br /> damages (including but not limited to all fees and Contract Times , or both , to the extent <br /> that they are <br /> ' charges of engineers , architects , attorneys , and other attributable to the existence or location of any <br /> professionals and all court or arbitration or other dispute Underground Facility that was not shown or indicated or <br /> resolution costs ) sustained by CONTRACTOR on or in not shown or indicated with reasonable accuracy in the <br /> connection with any other project or anticipated project. Contract Documents and that CONTRACTOR did not <br /> know of and could not reasonably have been expected <br /> 4. 04 Underground Facilities to be aware of or to have anticipated . If OWNER and <br /> CONTRACTOR are unable to agree on entitlement to or <br /> A. Shown or Indicated. The information and data shown on the amount or extent, if any, of any such adjustment <br /> ' or indicated in the Contract Documents with respect to existing in Contract Price or Contract Times , OWNER <br /> or <br /> Underground Facilities at or contiguous to the Site is based on CONTRACTOR may make a Claim therefore as <br /> information and data furnished to OWNER or ENGINEER by the provided in paragraph 10. 05. <br /> owners of such Underground Facilities , including OWNER, or by <br /> others . Unless it is otherwise expressly provided in the Sup- 4 . 05 Reference Points <br /> plementary Conditions : <br /> A. OWNER shall provide engineering surveys to <br /> 1 . OWNER and ENGINEER shall not be establish reference points for construction which in <br /> responsible for the accuracy or completeness of any ENGINEER's judgment are necessary to enable CON- <br /> such information or data ; and TRACTOR to proceed with the Work. CONTRACTOR shall be <br /> responsible for laying out the Work, shall protect and preserve <br /> 2. the cost of all of the following will be included in the established reference points and property monuments , <br /> and <br /> the Contract Price, and CONTRACTOR shall have full shall make no changes or relocations without the prior written <br /> responsibility for: approval of OWNER. CONTRACTOR shall report to <br /> ENGINEER whenever any reference point or property <br /> a . reviewing and checking all such information monument is lost or destroyed or requires relocation because of <br /> ' and data , necessary changes in grades or locations , and shall be <br /> responsible for the accurate replacement or relocation of such <br /> b. locating all Underground Facilities shown or reference points or property monuments by professionally <br /> indicated in the Contract Documents , qualified personnel . <br /> 044572000 <br /> 00700 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.