My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-169
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 11:06:40 AM
Creation date
9/30/2015 6:38:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/15/2003
Control Number
2003-169
Agenda Item Number
11.C.2
Entity Name
WPC Industrial Contractors
Subject
Clearwell Addition Post Treatment Modifications
FRP Piping Replacement Project Manual
Area
South RO WTP
Bid Number
5074
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3305
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to comply with Laws and Regulations applicable to the A. In connection with ENGINEER's authority as to Shop <br /> performance of the Work. Drawings and Samples , see paragraph 6. 17 . <br /> ' 9 . 03 Project Representative B . In connection with ENGINEER's authority as to <br /> A. If OWNER and ENGINEER agree, ENGINEER will Change Orders , see Articles 101 11 , and 12 . <br /> furnish a Resident Project Representative to assist ENGINEER C . In connection with ENGINEER's authority as to <br /> ' in providing more extensive observation of the Work. The Applications for Payment, see Article 14. <br /> responsibilities and authority and limitations thereon of any such <br /> Resident Project Representative and assistants will be as 9. 08 Determinations for Unit Price Work <br /> provided in paragraph 9. 10 and in the Supplementary <br /> ' Conditions . If OWNER designates another representative or A. ENGINEER will determine the actual quantities and <br /> agent to represent OWNER at the Site who is not ENGINEER's classifications of Unit Price Work performed by CONTRACTOR. <br /> Consultant, agent or employee, the responsibilities and authority ENGINEER will review with CONTRACTOR the ENGINEER's <br /> and limitations thereon of such other individual or entity will be preliminary determinations on such matters before rendering <br /> a <br /> ' as provided in the Supplementary Conditions . written decision thereon (by recommendation of an Application <br /> for Payment or otherwise). ENGINEER's written decision <br /> 9 . 04 Clarifications and Interpretations thereon will be final and binding (except as modified <br /> by <br /> ENGINEER to reflect changed factual conditions or more <br /> ' A. ENGINEER will issue with reasonable promptness accurate data ) upon OWNER and CONTRACTOR, subject to <br /> such written clarifications or interpretations of the requirements the provisions of paragraph 10 . 05. <br /> of the Contract Documents as ENGINEER may determine <br /> necessary, which shall be consistent with the intent of and 9. 09 Decisions on Requirements of Contract Documents <br /> ' reasonably inferable from the Contract Documents . Such and Acceptability of Work <br /> written clarifications and interpretations will be binding on <br /> OWNER and CONTRACTOR. If OWNER and CONTRACTOR A. ENGINEER will be the initial interpreter of the <br /> are unable to agree on entitlement to or on the amount or requirements of the Contract Documents <br /> and judge of the <br /> ' extent, if any, of any adjustment in the Contract Price or acceptability of the Work thereunder. <br /> Claims , disputes and <br /> Contract Times, or both, that should be allowed as a result of a other matters relating to the acceptability <br />of the Work , the <br /> written clarification or interpretation, a Claim may be made quantities and classifications of Unit Price Work , the <br /> therefore as provided in paragraph 10. 05. interpretation of the requirements of the Contract Documents <br /> ' pertaining to the performance of the Work , and Claims seeking <br /> 9 . 05 Authorized Variations in Work changes in the Contract Price or Contract Times will be referred <br /> initially to ENGINEER in writing , in accordance with the <br /> A. ENGINEER may authorize minor variations in the provisions of paragraph 10 . 05, with a request <br /> for a formal <br /> ' Work from the requirements of the Contract Documents which decision. <br /> do not involve an adjustment in the Contract Price or the <br /> Contract Times and are compatible with the design concept of B . When functioning as interpreter and judge under this <br /> the completed Project as a functioning whole as indicated by the paragraph 9. 09, ENGINEER will not show partiality to OWNER <br /> ' Contract Documents . These may be accomplished by a Field or CONTRACTOR and will not be liable in connection with <br /> any <br /> Order and will be binding on OWNER and also on CON- interpretation or decision rendered in <br /> good faith in such <br /> TRACTOR, who shall perform the Work involved promptly. If capacity . The rendering of a decision by ENGINEER pursuant <br /> OWNER and CONTRACTOR are unable to agree on to this paragraph 9.09 with respect to any such Claim, dispute, <br /> ' entitlement to or on the amount or extent, if any, of any or other matter (except any which <br /> have been waived by the <br /> adjustment in the Contract Price or Contract Times, or both, as making or acceptance of final payment as provided in paragraph <br /> a result of a Field Order, a Claim may be made therefore as 14 . 07) will be a condition precedent to any exercise <br /> by OWNER <br /> provided in paragraph 10. 05. or CONTRACTOR of such rights or remedies as either may <br /> otherwise have under the Contract Documents or by Laws or <br /> 9 . 06 Rejecting Defective Work Regulations in respect of any such Claim, dispute, or other <br /> matter. <br /> A. ENGINEER will have authority to disapprove or reject <br /> ' Work which ENGINEER believes to be defective, or that 9. 10 Limitations on ENGINEER 's Authority and <br />Respon- <br /> ENGINEER believes will not produce a completed Project that sibilities <br /> conforms to the Contract Documents or that will prejudice the <br /> integrity of the design concept of the completed Project as a A. Neither ENGINEER's authority or responsibility under <br /> functioning whole as indicated by the Contract Documents . this Article 9 or under any other provision of <br /> the Contract <br /> ENGINEER will also have authority to require special inspection Documents nor any decision made by ENGINEER in good faith <br /> or testing of the Work as provided in paragraph 13. 04 , whether either to exercise or not exercise such authority or responsibility <br /> or not the Work is fabricated , installed , or completed . or the undertaking , exercise, or performance of any authority or <br /> responsibility by ENGINEER shall create , impose, or give rise to <br /> 9 . 07 Shop Drawings, Change Orders and Payments any duty in contract, tort, or otherwise owed by ENGINEER to <br /> CONTRACTOR, any Subcontractor, any Supplier, any other <br /> 044572000 <br /> 00700 - 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.