Laserfiche WebLink
2 . Cost of all materials and equipment in accordance with rental agreements approved <br /> furnished and incorporated in the Work , includ- by OWNER with the advice of ENGINEER, and <br /> ing costs of transportation and storage thereof, the costs of transportation , loading , unloading , <br /> and Suppliers' field services . required in assembly, dismantling , and removal thereof. <br /> connection therewith . All cash discounts shall All such costs shall be in accordance with the <br /> accrue to CONTRACTOR unless OWNER terms of said rental agreements . The rental of <br /> deposits funds with CONTRACTOR with which any such equipment, machinery, or parts shall <br /> to make payments, in which case the cash cease when the use thereof is no longer <br /> discounts shall accrue to OWNER. All trade necessary for the Work. <br /> discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment d . Sales, consumer, use, and other <br /> shall accrue to OWNER, and CONTRACTOR similar taxes related to the Work, and for which <br /> shall make provisions so that they may be CONTRACTOR is liable, imposed by Laws and <br /> obtained . Regulations. <br /> 3 . Payments made by CONTRACTOR e . Deposits lost for causes other than <br /> to Subcontractors for Work performed by negligence of CONTRACTOR, any Sub- <br /> Subcontractors . If required by OWNER, CON- contractor, or anyone directly or indirectly <br /> TRACTOR shall obtain competitive bids from employed by any of them or for whose acts any <br /> subcontractors acceptable to OWNER and of them may be liable, and royalty payments <br /> CONTRACTOR and shall deliver such bids to and fees for permits and licenses . <br /> OWNER, who will then determine, with the <br /> advice of ENGINEER, which bids, if any, will be f. Losses and damages (and related <br /> acceptable . If any subcontract provides that the expenses) caused by damage to the Work, not <br /> Subcontractor is to be paid on the basis of Cost compensated by insurance or otherwise, sus- <br /> of the Work plus a fee, the Subcontractor's tained by CONTRACTOR in connection with <br /> Cost of the Work and fee shall be determined the performance of the Work (except losses <br /> in the same manner as CONTRACTOR's Cost and damages within the deductible amounts of <br /> of the Work and fee as provided in this para- property insurance established in accordance <br /> graph 11 . 01 , with paragraph 5 .06 . D ), provided such losses <br /> and damages have resulted from causes other <br /> 4. Costs of special consultants than the negligence of CONTRACTOR, any <br /> (including but not limited to engineers , Subcontractor, or anyone directly or indirectly <br /> architects , testing laboratories , surveyors , employed by any of them or for whose acts any <br /> attorneys , and accountants) employed for of them may be liable . Such losses shall <br /> services specifically related to the Work, include settlements made with the written <br /> consent and approval of OWNER. No such <br /> 5. Supplemental costs including the losses, damages, and expenses shall be <br /> following : included in the Cost of the Work for the <br /> purpose of determining CONTRACTOR's fee. <br /> a. The proportion of necessary trans- <br /> portation , travel , and subsistence expenses of g . The cost of utilities, fuel , and sanitary <br /> CONTRACTOR's employees incurred in dis- facilities at the Site . <br /> charge of duties connected with the Work. <br /> h . Minor expenses such as telegrams, <br /> b . Cost, including transportation and long distance telephone calls , telephone service <br /> maintenance, of all materials , supplies , equip- at the Site, expressage , and similar petty cash <br /> ment, machinery, appliances , office, and items in connection with the Work, <br /> temporary facilities at the Site , and hand tools <br /> not owned by the workers , which are consumed i . When the Cost of the Work is used to <br /> in the performance of the Work, and cost, less determine the value of a Change Order or of a <br /> market value, of such items used but not con- Claim , the cost of premiums for additional <br /> sumed which remain the property of CON- Bonds and insurance required because of the <br /> TRACTOR. changes in the Work or caused by the event <br /> giving rise to the Claim . <br /> C, Rentals of all construction equip- <br /> ment and machinery, and the parts thereof j . When all the Work is performed on the <br /> whether rented from CONTRACTOR or others basis of cost-plus , the costs of premiums for all <br /> 00700 - General Conditions <br /> 00700 - 32 <br /> FAEngineeringTatifion Paving\0522 Ist Rd. from 32nd Ave. to 35th Ave\Bid Documents\00700 - General Conditlons.doc <br />