2 . Cost of all materials and equipment in accordance with rental agreements approved
<br /> furnished and incorporated in the Work , includ- by OWNER with the advice of ENGINEER, and
<br /> ing costs of transportation and storage thereof, the costs of transportation , loading , unloading ,
<br /> and Suppliers' field services . required in assembly, dismantling , and removal thereof.
<br /> connection therewith . All cash discounts shall All such costs shall be in accordance with the
<br /> accrue to CONTRACTOR unless OWNER terms of said rental agreements . The rental of
<br /> deposits funds with CONTRACTOR with which any such equipment, machinery, or parts shall
<br /> to make payments, in which case the cash cease when the use thereof is no longer
<br /> discounts shall accrue to OWNER. All trade necessary for the Work.
<br /> discounts, rebates and refunds and returns
<br /> from sale of surplus materials and equipment d . Sales, consumer, use, and other
<br /> shall accrue to OWNER, and CONTRACTOR similar taxes related to the Work, and for which
<br /> shall make provisions so that they may be CONTRACTOR is liable, imposed by Laws and
<br /> obtained . Regulations.
<br /> 3 . Payments made by CONTRACTOR e . Deposits lost for causes other than
<br /> to Subcontractors for Work performed by negligence of CONTRACTOR, any Sub-
<br /> Subcontractors . If required by OWNER, CON- contractor, or anyone directly or indirectly
<br /> TRACTOR shall obtain competitive bids from employed by any of them or for whose acts any
<br /> subcontractors acceptable to OWNER and of them may be liable, and royalty payments
<br /> CONTRACTOR and shall deliver such bids to and fees for permits and licenses .
<br /> OWNER, who will then determine, with the
<br /> advice of ENGINEER, which bids, if any, will be f. Losses and damages (and related
<br /> acceptable . If any subcontract provides that the expenses) caused by damage to the Work, not
<br /> Subcontractor is to be paid on the basis of Cost compensated by insurance or otherwise, sus-
<br /> of the Work plus a fee, the Subcontractor's tained by CONTRACTOR in connection with
<br /> Cost of the Work and fee shall be determined the performance of the Work (except losses
<br /> in the same manner as CONTRACTOR's Cost and damages within the deductible amounts of
<br /> of the Work and fee as provided in this para- property insurance established in accordance
<br /> graph 11 . 01 , with paragraph 5 .06 . D ), provided such losses
<br /> and damages have resulted from causes other
<br /> 4. Costs of special consultants than the negligence of CONTRACTOR, any
<br /> (including but not limited to engineers , Subcontractor, or anyone directly or indirectly
<br /> architects , testing laboratories , surveyors , employed by any of them or for whose acts any
<br /> attorneys , and accountants) employed for of them may be liable . Such losses shall
<br /> services specifically related to the Work, include settlements made with the written
<br /> consent and approval of OWNER. No such
<br /> 5. Supplemental costs including the losses, damages, and expenses shall be
<br /> following : included in the Cost of the Work for the
<br /> purpose of determining CONTRACTOR's fee.
<br /> a. The proportion of necessary trans-
<br /> portation , travel , and subsistence expenses of g . The cost of utilities, fuel , and sanitary
<br /> CONTRACTOR's employees incurred in dis- facilities at the Site .
<br /> charge of duties connected with the Work.
<br /> h . Minor expenses such as telegrams,
<br /> b . Cost, including transportation and long distance telephone calls , telephone service
<br /> maintenance, of all materials , supplies , equip- at the Site, expressage , and similar petty cash
<br /> ment, machinery, appliances , office, and items in connection with the Work,
<br /> temporary facilities at the Site , and hand tools
<br /> not owned by the workers , which are consumed i . When the Cost of the Work is used to
<br /> in the performance of the Work, and cost, less determine the value of a Change Order or of a
<br /> market value, of such items used but not con- Claim , the cost of premiums for additional
<br /> sumed which remain the property of CON- Bonds and insurance required because of the
<br /> TRACTOR. changes in the Work or caused by the event
<br /> giving rise to the Claim .
<br /> C, Rentals of all construction equip-
<br /> ment and machinery, and the parts thereof j . When all the Work is performed on the
<br /> whether rented from CONTRACTOR or others basis of cost-plus , the costs of premiums for all
<br /> 00700 - General Conditions
<br /> 00700 - 32
<br /> FAEngineeringTatifion Paving\0522 Ist Rd. from 32nd Ave. to 35th Ave\Bid Documents\00700 - General Conditlons.doc
<br />
|