2008-260A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 12:05:06 PM
Creation date
10/1/2015 12:30:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
08/19/2008
Control Number
2008-260A
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contract
Area
1st.Rd.-35th to 32nd.Avenue;10th Ct.SW-Oslo Rd.to 7thSt.SW
Project Number
0522,0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7534
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 . 06 Final Inspection <br /> B . Review of Application and Acceptance <br /> A. Upon written notice from CONTRACTOR that <br /> the entire Work or an agreed portion thereof is 1 . If, on the basis of ENGINEER's <br /> complete, ENGINEER will promptly make a final observation of the Work during construction <br /> inspection with OWNER and CONTRACTOR and will and final inspection , and ENGINEER's review <br /> notify CONTRACTOR in writing of all particulars in of the final Application for Payment and <br /> which this inspection reveals that the Work is accompanying documentation as required by <br /> incomplete or defective . CONTRACTOR shall the Contract Documents , ENGINEER is <br /> immediately take such measures as are necessary to satisfied that the Work has been completed <br /> complete such Work or remedy such deficiencies . and CONTRACTOR's other obligations under <br /> the Contract Documents have been fulfilled , <br /> 14 . 07 Final Payment ENGINEER will , within ten days after receipt of <br /> the final Application for Payment, indicate in <br /> A. Application for Payment writing ENGINEER's recommendation of <br /> payment and present the Application for <br /> 1 . After CONTRACTOR has, in the Payment to OWNER for payment. At the same <br /> opinion of ENGINEER, satisfactorily completed time ENGINEER will also give written notice to <br /> all corrections identified during the final OWNER and CONTRACTOR that the Work is <br /> inspection and has delivered , in accordance acceptable subject to the provisions of <br /> with the Contract Documents , all maintenance paragraph 14 .09 . Otherwise, ENGINEER will <br /> and operating instructions , schedules , guaran- return the Application for Payment to <br /> tees , Bonds, certificates or other evidence of CONTRACTOR, indicating in writing the <br /> insurance certificates of inspection , marked-up reasons for refusing to recommend final <br /> record documents (as provided in paragraph payment, in which case CONTRACTOR shall <br /> 6 . 12), and other documents , CONTRACTOR make the necessary corrections and resubmit <br /> may make application for final payment follow- the Application for Payment. <br /> ing the procedure for progress payments . <br /> C . Payment Becomes Due <br /> 2 . The final Application for Payment <br /> shall be accompanied (except as previously <br /> delivered ) by: (i) all documentation called for in <br /> the Contract Documents , including but not 1 0 1 1 tatieR , the amnlant <br /> limited to the evidence of insurance required by <br /> subparagraph 5 .04 . 13 . 7 ; (ii) consent of the and, when due, will be paid by GWh' F= R te <br /> surety, if any, to final payment; and (iii) C, Q1hITR.AC_ T <br /> complete and legally effective releases or <br /> waivers (satisfactory to OWNER) of all Lien 14.08 Final Completion Delayed <br /> rights arising out of or Liens filed in connection <br /> with the Work. A. If, through no fault of CONTRACTOR, final <br /> completion of the Work is significantly delayed , and if <br /> 3 . In lieu of the releases or waivers of ENGINEER so confirms , OWNER shall , upon receipt <br /> Liens specified in paragraph 14 .07 .A.2 and as of CONTRACTOR's final Application for Payment and <br /> approved by OWNER, CONTRACTOR may recommendation of ENGINEER, and without terminat- <br /> furnish receipts or releases in full and an ing the Agreement, make payment of the balance due <br /> affidavit of CONTRACTOR that: (i) the releases for that portion of the Work fully completed and <br /> and receipts include all labor, services , accepted . If the remaining balance to be held by <br /> material , and equipment for which a Lien could OWNER for Work not fully completed or corrected is <br /> be filed ; and (ii ) all' payrolls, material and less than the retainage stipulated in the Agreement, <br /> equipment bills, and other indebtedness and if Bonds have been furnished as required in <br /> connected with the Work for which OWNER or paragraph 5 .01 , the written consent of the surety to <br /> OWNER's property might in any way be the payment of the balance due for that portion of the <br /> responsible have been paid or otherwise satis- Work fully completed and accepted shall be submitted <br /> fled . If any Subcontractor or Supplier fails to by CONTRACTOR to ENGINEER with the Application <br /> furnish such a release or receipt in full , CON- for such payment. Such payment shall be made <br /> TRACTOR may furnish a Bond or other under the terms and conditions governing final <br /> collateral satisfactory to OWNER to indemnify payment, except that it shall not constitute a waiver of <br /> OWNER against any Lien . Claims . <br /> 00700 - General Conditions <br /> 00700 - 42 <br /> FAEngineering\Petition Paving\0522 1st Rd. from 32nd Ave. to 35th Ave\Bid Documents\00700 - General Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.