My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-260A
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 12:05:06 PM
Creation date
10/1/2015 12:30:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
08/19/2008
Control Number
2008-260A
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contract
Area
1st.Rd.-35th to 32nd.Avenue;10th Ct.SW-Oslo Rd.to 7thSt.SW
Project Number
0522,0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7534
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . for completed and acceptable Work or Contract Times or otherwise for expenses or <br /> executed in accordance with the Contract damage directly attributable to CONTRACTOR's <br /> Documents prior to the effective date of stopping the Work as permitted by this paragraph . <br /> termination , including fair and reasonable sums <br /> for overhead and profit on such Work; <br /> ARTICLE 16 - DISPUTE RESOLUTION <br /> 2 , for expenses sustained prior to the <br /> effective date of termination in performing <br /> services and furnishing labor, materials , or 16 .01 Methods and Procedures <br /> equipment as required by the Contract <br /> Documents in connection with uncompleted A. Dispute resolution methods and procedures, if <br /> Work, plus fair and reasonable sums for any, shall be as set forth in the Supplementary <br /> overhead and profit on such expenses; Conditions . If no method and procedure has been set <br /> forth , and subject to the provisions of paragraphs 9 .09 <br /> 3 , for all claims, costs , losses , and and 10 .05 , OWNER and CONTRACTOR may <br /> damages (including but not limited to all fees exercise such rights or remedies as either may <br /> and charges of engineers , architects , attorneys, otherwise have under the Contract Documents or by <br /> and other professionals and all court or Laws or Regulations in respect of any dispute . <br /> arbitration or other dispute resolution costs) in- <br /> curred in settlement of terminated contracts <br /> with Subcontractors , Suppliers, and others; and ARTICLE 17 - MISCELLANEOUS <br /> 4 , for reasonable expenses directly <br /> attributable to termination . 17 .01 Giving Notice <br /> B . CONTRACTOR shall not be paid on account A. Whenever any provision of the Contract <br /> of loss of anticipated profits or revenue or other eco- Documents requires the giving of written notice, it will <br /> nomic loss arising out of or resulting from such be deemed to have been validly given if delivered in <br /> termination . person to the individual or to a member of the firm or <br /> to an officer of the corporation for whom it is intended , <br /> 15 . 04 CONTRACTOR May Stop Work or or if delivered at or sent by registered or certified mail , <br /> Terminate postage prepaid, to the last business address known <br /> to the giver of the notice . <br /> A. If, through no act or fault of CONTRACTOR, <br /> the Work is suspended for more than 90 consecutive 17 . 02 Computation of Times <br /> days by OWNER or under an order of court or other <br /> public authority, or ENGINEER fails to act on any A. When any period of time is referred to in the <br /> Application for Payment within 30 days after it is Contract Documents by days , it will be computed <br /> to <br /> submitted , nr QA1Nlr= R fa6lrz for 20 days to pay G exclude the first and include the last day of <br />such <br /> TRACTOR any sum finally daitarmORAcl to be due, then period . If the last day of any such period falls on a <br /> CONTRACTOR may, upon seven days written notice Saturday or Sunday or on a day made a legal holiday <br /> to OWNER and ENGINEER, and provided OWNER by the law of the applicable jurisdiction , such day will <br /> or ENGINEER do not remedy such suspension or be omitted from the computation , <br /> failure within that time, terminate the Contract and <br /> recover from OWNER payment on the same terms as 17 . 03 Cumulative Remedies <br /> provided in paragraph 15 .03 . In lieu of terminating the <br /> Contract and without prejudice to any other right or A. The duties and obligations imposed by these <br /> remedy, if ENGINEER has failed to act on an General Conditions and the rights and remedies avail- <br /> Application for Payment within 30 days after it is able hereunder to the parties hereto are in addition <br />to, <br /> submitted , and are not to be construed in any way as a limitation <br /> of, any rights and remedies available to any or all of <br /> CONTRACTOR may, seven days after written notice them which are otherwise imposed or available by <br /> to OWNER and ENGINEER, stop the Work until Laws or Regulations , by special warranty or <br /> payment is made of all such amounts due guarantee, or by other provisions of the Contract <br /> CONTRACTOR, including interest thereon . The Documents , and the provisions of this paragraph will <br /> provisions of this paragraph 15.04 are not intended to be as effective as if repeated specifically in the <br /> preclude CONTRACTOR from making a Claim under Contract Documents in connection with each <br /> paragraph 10 .05 for an adjustment in Contract Price <br /> 00700 - General Conditions <br /> 00700 - 44 <br /> FAEngineeringTatition Paving\05221st Rd. from 32nd Ave. to 35th AvetBid Documentst00700 - General Condltions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.