Laserfiche WebLink
17 . Drawings—That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work. <br /> which graphically shows the scope , extent, and <br /> character of the Work to be performed by 28 . Notice of Award--The written notice by <br /> CONTRACTOR. Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined . bidder with the conditions precedent listed therein , <br /> OWNER will sign and deliver the Agreement. <br /> 18. Effective Date of the Agreement--The <br /> date indicated in the Agreement on which it becomes 29 . Notice to Proceed—A written notice given <br /> effective, but if no such date is indicated , it means the by OWNER to CONTRACTOR fixing the date on <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run and <br /> by the last of the two parties to sign and deliver. on which CONTRACTOR shall start to perform the <br /> Work under the Contract Documents , <br /> 19 . ENGINEER--The individual or entity <br /> named as such in the Agreement. 30 . OWNER--The individual , entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 2Q cNQ1A117= ►; „+ AF i;doyed gal aF entered into the Agreement and for whom the Work is <br /> to be performed . <br /> 31 . Partial Utilization--Use by OWNER of a <br /> who substantially completed part of the Work for the pur- <br /> Eeaditiegs pose for which it is intended (or a related purpose) <br /> prior to Substantial Completion of all the Work. <br /> 21 , Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the 32 . PCBs--Polychlorinated biphenyls . <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times . 33 . Petroleum--Petroleum , including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22 . General Requirements—Sections of conditions of temperature and pressure (60 degrees <br /> Division 1 of the Specifications . The General Fahrenheit and 14.7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute), such as oil , petroleum , fuel oil , oil sludge, oil <br /> tions . refuse, gasoline, kerosene, and oil mixed with other <br /> non-Hazardous Waste and crude oils . <br /> 23 . Hazardous Environmental Condition The <br /> presence at the Site of Asbestos , PCBs , Petroleum , 34 . Project—The total construction of which <br /> Hazardous Waste, or Radioactive Material in such the Work to be performed under the Contract <br /> quantities or circumstances that may present a Documents may be the whole, or a part as may be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents , <br /> thereto in connection with the Work. <br /> 35, Project Manual--The bound documentary <br /> 24 . Hazardous Waste—The term Hazardous information prepared for bidding and constructing the <br /> Waste shall have the meaning provided in Section Work. A listing of the contents of the Project Manual , <br /> 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes, <br /> is <br /> Section 6903) as amended from time to time. contained in the table(s) of contents . <br /> 25 . Laws and Regulations; Laws or Regulat 36 . Radioactive Matedal--Source , special <br /> ions—Any and all applicable laws , rules , regulations, nuclear, or byproduct material as defined by the <br /> ordinances , codes , and orders of any and all govem- Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> mental bodies , agencies , authorities, and courts seq . ) as amended from time to time, <br /> having jurisdiction . <br /> 37 . Resident Project Representative--The <br /> 26 . Liens—Charges , security interests , or authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds, real property, or assigned to the Site or any part thereof. <br /> personal property. <br /> 38 . Samples--Physical examples of <br /> 27 . Milestone—A principal event specified in materials, equipment, or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700 - General Condibons <br /> 00700 - 6 <br /> FAEngineeringTetitlon Paving\0522 Iat Rd. from 32nd Ave. to 35th Ave\Bld Document"0700 - General Conditions.dDc <br />