Laserfiche WebLink
SECTION 01009 <br />SPECIAL PROVISIONS <br />1.1 GENERAL <br />A. Visits to the construction site may be made by representatives of permitting or <br />governing bodies. Submit details of all instructions from the above to the ENGINEER <br />immediately. The Work will not be accepted by the OWNER until final acceptance has <br />been received from the various Regulatory Agencies having jurisdiction. <br />B. Furnish sufficient labor, construction equipment and materials, and work such hours, <br />including night shifts and overtime operations, as may be necessary to insure the <br />prosecution of the work in accordance with the approved progress schedule. If, in the <br />opinion of the ENGINEER, the CONTRACTOR falls behind the progress schedule, take <br />such steps as may be necessary to improve progress, all without additional cost to the <br />OWNER. The ENGINEER shall be compensated for his overtime services in <br />accordance with the Supplementary Conditions, SC -6.02, <br />C. All, salvageable material and equipment for which specific use, relocation or other <br />disposal is not specifically noted, shall remain the property of the OWNER and shall be <br />delivered to the OWNER at the following location: 4550 41St Street, at the <br />CONTRACTOR's expense. All material and equipment not in salvageable condition, as <br />determined by the ENGINEER and the OWNER, shall be disposed of by the <br />CONTRACTOR, at the CONTRACTOR's expense. <br />D. In addition to these Specifications all work must comply with the requirements of the <br />local governing agency, St. Johns River Water Management District, Department of <br />Environmental Protection, U.S. Army Corps of Engineers, Sebastian River Water <br />Control District, and all other applicable State or Federal agencies' specifications and <br />permits. In the event of a conflict, the more stringent specification or requirement shall <br />govern. <br />E. Before performing any work outside the designated limits of the work site, secure any <br />necessary permits and authorization from the applicable owner, or verify in writing that <br />such has been previously obtained. Follow all requirements of any said permits or <br />authorization. Give the ENGINEER and appropriate owner ten (10) days minimum <br />notice before commencing construction operations outside the designated limits of the <br />work site. Adjacent property owners at time of bidding are listed below: <br />St Road 35th Avenue to 32"d Avenue <br />• Victoria Molinari — PID No. 15-33-39-00009-0004-00001.0 <br />• Gerald & Theresa Ripple — PID No. 15-33-39-00009-0004-00002.0 <br />• Steven & Teresa Boyle — PID No. 15-33-39-00009-0004-00004.0 <br />01009-1 01009 -Special Provisions <br />FAEngineering\Petition Paving\0522 1 st Rd. from 32nd Ave. to 35th Ave\Bid Documents\01009 - Special Provisions.doc <br />