My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-260D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 12:14:58 PM
Creation date
10/1/2015 12:30:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/19/2008
Control Number
2008-260D
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contracting
Area
10th Ct. Oslo Rd. to 7th St.SW 1st.Rd. 35th Ave. to 32nd Ave.
Project Number
0522, 0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7535
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br /> Post Final Inspection <br /> 1 . 1 GENERAL <br /> A. Approximately one year after Substantial Completion , the OWNER will make <br /> arrangements with the Construction Coordination Manager and the <br /> CONTRACTOR for a post final inspection and will send a written notice to said <br /> parties to inform them of the date and time of the inspection . <br /> B . Corrections of defective work noted by OWNER and Construction Coordination <br /> Manager shall comply with the applicable sections of Article 13 , General <br /> Conditions . <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any <br /> corrections required to release the performance and payment bonds . <br /> 01820 Post Final inspection <br /> 01820- 1 <br /> FAEngineering\Petition Paving\05221 st Rd. from 32nd Ave. to 35th Ave\Bid Documents\01820 - Post Final Inspection.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.