My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-260D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 12:14:58 PM
Creation date
10/1/2015 12:30:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/19/2008
Control Number
2008-260D
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contracting
Area
10th Ct. Oslo Rd. to 7th St.SW 1st.Rd. 35th Ave. to 32nd Ave.
Project Number
0522, 0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7535
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 102- 1 - Maintenance of Traffic - Lump Sum <br /> ITEM NO . 104-1 - EROSION AND WATER POLLUTION CONTROL <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution <br /> control measures shall prevent turbid or otherwise polluted waters from being <br /> discharged from the construction site or work area , to undeveloped portions of <br /> the site or off-site . <br /> Be The OWNER considers pollution from dewatering water and stormwater runoff <br /> from a construction site or work area to be a very serious offense . The <br /> CONTRACTOR is solely responsible for preventing pollution caused by <br /> dewatering water and stormwater runoff from the construction site or work area . <br /> Co The pollution control measures specified herein represent minimum standards <br /> to be adhered to by the CONTRACTOR throughout the Project' s construction . <br /> The OWNER reserves the right to require the CONTRACTOR to employ <br /> additional pollution control measures , when in the sole opinion of the OWNER , <br /> they are warranted . If site specific conditions require additional erosion and <br /> stormwater pollution control measures during any phase of construction or <br /> operation to prevent erosion or to control sediment or other pollution , beyond <br /> those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , "Best <br /> Management Practices for Erosion and Sedimentation Control " of the Florida <br /> Erosion and Sediment Control Inspector' s Manual , included herein in Appendix <br /> „ B „ <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply <br /> with this Section . Alternatively , the OWNER may halt the CONTRACTOR' s <br /> operations until the CONTRACTOR is in full compliance with this Section . If the <br /> OWNER halts the CONTRACTOR' s work as a result of its failure to comply with <br /> this Section , the Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control" of the Florida Erosion and <br /> Sediment Control Inspector' s Manual , included herein in Appendix "Be " If there <br /> is a conflict between the referenced Chapter 4 and these Specifications , the <br /> more stringent requirement shall prevail . <br /> 010254 Technical Specifications <br /> F:\Engineering\Petition Paving\0522 1st Rd . from 32nd Ave. to 35th Ave\Bid Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.