Laserfiche WebLink
include repairing of any damaged areas and replacing areas in which the <br /> establishment of the grass stand does not appear to be developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor's negligence , carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense . <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6" without mowing . <br /> Clippings shall be removed from sidewalk . <br /> K. Article 575-5 . The first two paragraphs under this Article are deleted and the <br /> following substituted : <br /> The contract unit price for sodding shall include the costs of sod , fertilizer (2 <br /> applications) , sidewalk sweeping after mowing , mowing , pegging disposal of <br /> clippings , water, tools , equipment, labor and all other incidentals necessary . <br /> L . Payment shall be made under: <br /> Item No . : 575- 1 - 1 - Sodding ( Bahia) - Per Square Yard <br /> Item No . : 575- 1 -A — Hydro Seed - Per Square Yard <br /> Item — 1000- Water and Sewer Utilities <br /> A . Water Utilities <br /> The water utilities for this project shall be constructed per the " Indian River County <br /> Department of Utility Services Water & Wastewater Standards" , latest edition . This <br /> document can be purchased from Indian River County Utilities . <br /> Relocation of existing fire hydrants shall include the cost of all pipe , fittings , thrust <br /> blocks , retaining rods , trenching grading , and incidental items associated with <br /> relocation . <br /> Pay Item No . 1644-800 - Fire Hydrant ( Relocation) - Each <br /> B . Sewer Utilities <br /> The sewer utilities for this project shall be constructed per the " Indian River County <br /> Technical Specifications" , latest edition . This document can be purchased from <br /> Indian River County Utilities , <br /> C . Earthwork and Backfill <br /> Compaction - All fill must be compacted by hand tamping from under the pipe up to <br /> the center line . Backfill shall be compacted in 6" lifts up to the surface to achieve a <br /> minimum compaction of 98 percent of maximum density in roadways and shoulders <br /> and 95 percent in easements , in accordance with AASATO T- 180 and 13-2167 . <br /> D . Ductile Iron Pipe and Fittings <br /> 01025-22 Technical Specifications <br /> FAEngineedng\Petition Paving\0522 1st Rd . from 32nd Ave. to 35th Ave\Bid Documents\Technical Specifications.doc <br />