My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-260B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-260B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 12:14:26 PM
Creation date
10/1/2015 12:31:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/19/2008
Control Number
2008-260B
Agenda Item Number
8.R.
Entity Name
SPS Contracting
Subject
Petition Paving Contract
Area
10thCt. Oslo Rd. to 7th St.SW, 1st Rd. 35thAve. to 32nd Ave.
Project Number
0522,0436
Bid Number
2008062
Supplemental fields
SmeadsoftID
7536
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. (continued) <br /> 2 . I accept full responsibility for any erosion to or shoalingin the District' s canal or levee due to my work <br /> and I shall remove or repair same promptly .arid at no expense to the District; and I will prevent the <br /> discharge of any. hyacinths or aquatic growth into the District 's canal through my connection . <br /> 3 . . I will neither plant ;treeg or shrubs or erect any structure that will prohibit or limit the existing access of <br /> District equipment or vehicles without securing proper authorization thereof. <br /> 4 . It is further understood and agreed that any other requirements of the District are binding upon me, the <br /> application, and I do hereby indicate acceptance of this notice thereof. <br /> 5 . It is further understood and agreed that the lands to be benefited by this request are, or may be , subject <br /> to flooding during periods of high water due to heavy rains or other acts of God, and that the permit will <br /> be accepted subject to this possibility which is recognized not to be within the control of the District. <br /> STANDARD PROVISOS <br /> 1 . Permittee assumes full responsibility for any construction, -operation or maintenance of District property or <br /> right-of-way subject to this Permit and shall save and hold harmless District from any expensg , .loss, damage <br /> or claim in regard thereto , and the District assumes and shall have no liability .in connection therewith. <br /> 2. This Permit may not be assigned or subletted to a third party and any transfer of Permittees property abut- <br /> ting District's property or right-of-way shall ipsofacto and without move , cancel, nullify and revoke this <br /> Permit. <br /> 3 . This Permit is subject always to the paramount right of the District to keep and maintain its drainage district . <br /> functions and operations , and is subject. to revocation and cancellation upon thirty days ' notice from District <br /> to Permittee . <br /> 4. In no event shall the District be liable for any damages done or caused by the District to the Public , to <br /> Permittee or any other person using the right-of- way or property subject to this Permit, and Permittee shall <br /> save the District, its officers , agents , supervisors and employees harmless from any costs, charge or expense <br /> of claim or demand of any person against the District arising from or pertaining to any use made of the <br /> property or right-of-way subject to this permit. Permittee shall, at any time upon request of District, provide <br /> to District evidence, satisfactory to District, of liability insurance coverage, in amounts and with companies <br /> as may be required by District, protecting the interests of District and naming District as an additional in- <br /> sured. <br /> 5 . The District may, on thirty days ' written notice to Permittee , require removal and/or alteration of any instal- <br /> lation or construction on District right-of-way. <br /> 6 . Any construction on District right-of-way or property and clean up shall be completed promptly by Permit- <br /> tee and in a workmanlike manner with minimum disturbance to existing berm, channel slopes and. grade with <br /> proper restoration and planting of any disturbed areas to prevent erosion within ten' days after completion of <br /> construction or installation . <br /> 7 . Permittee shall advise District ' s office prior to commencement and upon completion of all construction. <br /> (562-2141 ) <br /> 8 . Permittee shall not discharge any pollutants , contaminants or deleterious materials into water or structures <br /> owned or maintained by, or subject to the jurisdiction of District, nor permit anything to obstruct the flow of <br /> water; and shall save and hold District harmless from any expense, loss or damage to District or others by any <br /> such discharge or obstruction, remedying or removing the same' immediately upon request of District. <br /> 9 . Permittee, as a condition to the continuance of this Permit, shall reimburse District immediately upon de- <br /> mand, for any testing or other costs or expenses to District associated with or arising from Permitted's use of <br /> District facilities. <br /> 10 . Applicant is cautioned that electrical, water and sewer, or other installations Or utilities may be located <br /> within the construction area, and applicant shall use diligent efforts to first detect and locate all such instal- <br /> lations and shall coordinate construction with all other lawful users of said right-of-way. Applicant shall be <br /> liable for all damages proximately resulting from its interference with or interruption of services provided <br /> by other lawful right-of-way users . <br /> 11 . This permit shall be considered to be a license only, for the limited purpose of installation, placement and <br /> maintenance of the .improvements specified on the face hereof, and does not convey any other right, title or <br /> interest of the District in the subject.righ.t-of-way property. <br /> 12. Ari as-built/location certification of all culvert/structure installations within the District's canals/right-of- <br /> way shall be performed by a Florida Registered Professional Surveyor and Mapper on form provided by the <br /> District, and submitted to the District within thirty (30). days following completion of installation. If as-built <br /> certification is not received within thirty days of installation , the District willie then have certification <br /> completed at owner/applicants expense or order removal of the installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.