Laserfiche WebLink
M <br />other existing facilitles disturbed during construction; utilities <br />exploration, coordination with any permltti, ig agencies, trenching, <br />clearing and tree removal; dewatering; Installation of pipe with <br />fittings and all appurtenances; valves, Erre hydrant assemblies; wet <br />taps, restrainers; air release valves, line stops, soil compaction, <br />disinfection, testing, (includes providing temporary jumper or <br />another approved method for disinfection and flushing); road <br />restoration; regrading and grassing (sod), and traffrc control. <br />ARTICLE 2 ENGINEER <br />The project has been designed by Schulke, Bittle & Stoddard, LLC, hereinafter called <br />ENGINEER, and who is to act as OWNER'S representative, assume all duties and <br />responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the work in accordance with the Contract <br />Documents. <br />ARTICLE 3 <br />CONTRACT TIME <br />3.1 The <br />CONTRACTOR shall be <br />substantially <br />completed with the following timeframe <br />(a) Within 15 calendar days from effective date of Notice to Proceed, <br />Contractor shall complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to <br />be utilized <br />in the job. <br />3. Perform all photographic recording and documentation of <br />conditions prior to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating <br />construction. <br />(b) From 16 calendar days to 90 calendar days from the effective date of <br />Notice to Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their pre -construction <br />condition. <br />4. Correct all deficiencies noted by Engineer. <br />00530-3 <br />