Laserfiche WebLink
The final deliverable will be one set of Mylars , a PDF and the CADD file . <br /> 4 . Locate Wetland Flays <br /> Locate wetland flags for up to 4, 000 lineal feet of wetlands . This task should be done within <br /> fifty <br /> hours by a two- man field crew. The wetland lines will be input into Microstation and a CADD file <br /> and surveyors report will be furnished to the ENGINEER . One day of a GPS field crew <br /> will be <br /> allocated to locate a random selection of Burdette control points and found monuments . This item <br /> will be billed on an hourly basis not to exceed $ 8 , 200 . <br /> 5 . Review Title Information <br /> Review the title information for three parcels . Modify the map to reflect the title information . <br /> This <br /> item will be billed on an hourly basis not to exceed $ 800 . <br /> 6 . Deliverables <br /> The final deliverables include two copies of the signed and sealed legal sketches and descriptions, one <br /> PDF and the AutoCAD file of the legal sketches and descriptions (delivered to the COUNTY) . A <br /> Microstation electronic file will be delivered to the ENGINEER illustrating the completed right-of- <br /> way map . <br /> Be ROADWAY DESIGN ( Stanley Consultants , Inc . ) <br /> Roadway design services will include updating the four roadway plan and profile sheets , four <br /> roadway cross section sheets, two signing and pavement marking sheets, quantities and cost estimates <br /> for the following tasks : <br /> 1 . Eliminate full median opening and left turn lanes between Station 127+00 and Station <br /> 135 +50 . <br /> 2 . Design full median opening for Sebastian Park PUD between Station 131 +00 and Station <br /> 139+20 , <br /> 3 . Redesign stormwater management system within Basin 5 to conform to geometric revisions <br /> between Stations 127 +00 and 139+20 . <br /> 4 . Eliminate right turn lane and entrance side street at Station 179+50 . <br /> 5 . Design left turn lane between Station 180+00 and Station 183 + 50 . <br /> 6 . Redesign stormwater management system within Basin 7 to conform to geometric revisions <br /> between Stations 179+ 50 and 183 +50 . <br /> C . SIGNING AND PAVEMENT MARKING PLANS (Stanley Consultants, Inc . ) <br /> Signing and pavement marking plans will include the following tasks : <br /> 1 . Redesign the signing and pavement markings between Station 127 +00 and Station 139+20 . <br /> 2 . Redesign the signing and pavement markings between Station 179+ 50 and Station 183 + 50 . <br /> SECTION IV — TIME FOR COMPLETION <br /> Submittal Dates <br /> The final right-of--way mapping and legal descriptions and sketch deliverables shall be completed <br /> within six weeks after notice to proceed . The wetland delineation reports shall be completed three <br /> CR 510 Amendment 5 Page 2 of 4 8/3 /2009 <br />