My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-211
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 2:22:30 PM
Creation date
10/1/2015 3:43:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2009
Control Number
2009-211
Agenda Item Number
8.M.
Entity Name
Stanley Consultants
Subject
Amendment No.5 Final Design and Plans
Area
CR 510 from CR 512 east of 75th Court
Supplemental fields
SmeadsoftID
10741
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The final deliverable will be one set of Mylars , a PDF and the CADD file . <br /> 4 . Locate Wetland Flays <br /> Locate wetland flags for up to 4, 000 lineal feet of wetlands . This task should be done within <br /> fifty <br /> hours by a two- man field crew. The wetland lines will be input into Microstation and a CADD file <br /> and surveyors report will be furnished to the ENGINEER . One day of a GPS field crew <br /> will be <br /> allocated to locate a random selection of Burdette control points and found monuments . This item <br /> will be billed on an hourly basis not to exceed $ 8 , 200 . <br /> 5 . Review Title Information <br /> Review the title information for three parcels . Modify the map to reflect the title information . <br /> This <br /> item will be billed on an hourly basis not to exceed $ 800 . <br /> 6 . Deliverables <br /> The final deliverables include two copies of the signed and sealed legal sketches and descriptions, one <br /> PDF and the AutoCAD file of the legal sketches and descriptions (delivered to the COUNTY) . A <br /> Microstation electronic file will be delivered to the ENGINEER illustrating the completed right-of- <br /> way map . <br /> Be ROADWAY DESIGN ( Stanley Consultants , Inc . ) <br /> Roadway design services will include updating the four roadway plan and profile sheets , four <br /> roadway cross section sheets, two signing and pavement marking sheets, quantities and cost estimates <br /> for the following tasks : <br /> 1 . Eliminate full median opening and left turn lanes between Station 127+00 and Station <br /> 135 +50 . <br /> 2 . Design full median opening for Sebastian Park PUD between Station 131 +00 and Station <br /> 139+20 , <br /> 3 . Redesign stormwater management system within Basin 5 to conform to geometric revisions <br /> between Stations 127 +00 and 139+20 . <br /> 4 . Eliminate right turn lane and entrance side street at Station 179+50 . <br /> 5 . Design left turn lane between Station 180+00 and Station 183 + 50 . <br /> 6 . Redesign stormwater management system within Basin 7 to conform to geometric revisions <br /> between Stations 179+ 50 and 183 +50 . <br /> C . SIGNING AND PAVEMENT MARKING PLANS (Stanley Consultants, Inc . ) <br /> Signing and pavement marking plans will include the following tasks : <br /> 1 . Redesign the signing and pavement markings between Station 127 +00 and Station 139+20 . <br /> 2 . Redesign the signing and pavement markings between Station 179+ 50 and Station 183 + 50 . <br /> SECTION IV — TIME FOR COMPLETION <br /> Submittal Dates <br /> The final right-of--way mapping and legal descriptions and sketch deliverables shall be completed <br /> within six weeks after notice to proceed . The wetland delineation reports shall be completed three <br /> CR 510 Amendment 5 Page 2 of 4 8/3 /2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.