My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-432
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 11:25:30 AM
Creation date
10/1/2015 1:13:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/23/2008
Control Number
2008-432
Agenda Item Number
8.H.
Entity Name
Stanley Consultants Inc.
Subject
Amendment 4 Final Design and Plans
Area
CR 510 from CR 512 to 75th Ct.
Supplemental fields
SmeadsoftID
8259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT 4 " <br /> FINAL DESIGN AND PLANS PREPARATION FOR <br /> CR 510 from CR 512 to east of 75`h Court <br /> This is an amendment to the existing Final Design and Plans Preparation services agreement <br /> (AGREEMENT), dated November 17 , 2005 , by and between INDIAN RIVER COUNTY, hereinafter <br /> referred to as the COUNTY, and STANLEY CONSULTANTS , INC . , hereinafter referred to as the <br /> ENGINEER. This amendment addresses changes in " Section I — Project limits and Description, Section III — <br /> Scope of Services, Section IV — Time for Completion, and Section V - Compensation ' of the AGREEMENT. <br /> Amendment Description <br /> SECTION I - PROJECT LIMITS AND DESCRIPTION is being modified to incorporate the following <br /> engineering services : <br /> A . Perform two STP borings at the proposed bridge crossing over the slough ( Station 175 +40) and <br /> one STP boring at bridge crossing the Lateral L Canal . <br /> B . Design two paved rural turnouts and design one full median opening at Station 43 +00 . Add a U- <br /> turn lane for the south approach of the full median opening at Station 43 +00 . Design northbound <br /> right turn lanes to four commercial parcels between Station 33 +00 and 47+00 . Revise Basin 1 <br /> drainage affected by these geometric changes . <br /> C . Revise signing and pavement marking plans for the new turnouts, the full median opening, U-turn <br /> lane and the new right turn lanes . <br /> SECTION II — non applicable. <br /> SECTION III - SCOPE OF SERVICES is being modified to incorporate the following : <br /> The ENGINEER agrees to perform professional roadway design and related services in connection with the <br /> project as required and set forth in the following : <br /> A . Geotechnical Investigation — SPT Borings - Soil Investigation GCME, Inc . ) <br /> Geotechnical investigation will include the following tasks : <br /> 1 . Perform two (2) SPT borings (each 85 -ft deep) . One SPT boring will be performed at <br /> each side of the proposed bridge crossing the Slough area; the approximate location of <br /> bridge is at Station 175 +40 . <br /> 2 . Perform one ( 1 ) SPT boring (40-ft deep) at Lateral L Canal bridge for MSE wall design . <br /> 3 . Geotechnical services shall include laboratory testing and classification of soils, <br /> geotechnical engineering analysis and design , and documentation of findings . <br /> CR 510 Amendment 4 Page I of 4 12/9/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.