Laserfiche WebLink
B . Roadway Design (Stanley Consultants) <br /> Roadway design services will include updating four roadway plan profile sheets , seven <br /> roadway cross section sheets, quantities and cost estimates for the following tasks : <br /> 1 . Design two paved rural turnouts at Station 36+50 (RT) and Station 47+50 (RT) per <br /> FDOT Index No . 515 . The width of the turnouts will be 24 feet. <br /> 2 . Design one full median opening at Station 43 +00 . Add a U-turn lane for the south <br /> approach using the minimum turn lane length of 280 feet per Indian River County <br /> Typical Drawings for Pavement Markings, Signing and Geometrics . <br /> 3 . Design right turn lanes to four commercial parcels between Station 33 +00 and 47 +00 . <br /> Revise the roadway cross sections between 33 +00 and 47+00 . <br /> 4 . Redesign the stormwater management system within basin one to conform to geometric <br /> revisions and parcel location for pond one . The system includes thirty drainage structures <br /> and one pond design located between CR512 and 891h Street. This includes one meeting <br /> with St Johns River Water Management District, one field visit, quantities and cost <br /> estimate . <br /> C . Sinning and Pavement Markin Plans ( Stanley Consultants) <br /> Signing and Pavement marking Plans will include the following tasks : <br /> 1 . Analyze and redesign the signing and pavement markings for the full median opening <br /> and U-turn lane at Station 43 +00 . <br /> 2 . Analyze and redesign the signing and pavement markings for the four right turn lanes . <br /> 3 . Revise one plan sheet and update signing and pavement marking quantities . <br /> SECTION IV — TIME FOR COMPLETION <br /> Submittal Dates <br /> The 90% Design Drawing Submittal is moved four months after the Notice to Proceed is given for <br /> this Amendment. If the stormwater management pond locations change within this four month <br /> period, then the 90% Design Drawing Submittal will be moved forward to a time determined by the <br /> COUNTY and the ENGINEER. The stormwater management pond locations shall be determined by <br /> the COUNTY and the ENGINEER within one month from the Notice to Proceed of this Amendment. <br /> CR 510 Amendment 4 Page 2 of 4 12/9/2008 <br />