My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-432
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 11:25:30 AM
Creation date
10/1/2015 1:13:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/23/2008
Control Number
2008-432
Agenda Item Number
8.H.
Entity Name
Stanley Consultants Inc.
Subject
Amendment 4 Final Design and Plans
Area
CR 510 from CR 512 to 75th Ct.
Supplemental fields
SmeadsoftID
8259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Roadway Design (Stanley Consultants) <br /> Roadway design services will include updating four roadway plan profile sheets , seven <br /> roadway cross section sheets, quantities and cost estimates for the following tasks : <br /> 1 . Design two paved rural turnouts at Station 36+50 (RT) and Station 47+50 (RT) per <br /> FDOT Index No . 515 . The width of the turnouts will be 24 feet. <br /> 2 . Design one full median opening at Station 43 +00 . Add a U-turn lane for the south <br /> approach using the minimum turn lane length of 280 feet per Indian River County <br /> Typical Drawings for Pavement Markings, Signing and Geometrics . <br /> 3 . Design right turn lanes to four commercial parcels between Station 33 +00 and 47 +00 . <br /> Revise the roadway cross sections between 33 +00 and 47+00 . <br /> 4 . Redesign the stormwater management system within basin one to conform to geometric <br /> revisions and parcel location for pond one . The system includes thirty drainage structures <br /> and one pond design located between CR512 and 891h Street. This includes one meeting <br /> with St Johns River Water Management District, one field visit, quantities and cost <br /> estimate . <br /> C . Sinning and Pavement Markin Plans ( Stanley Consultants) <br /> Signing and Pavement marking Plans will include the following tasks : <br /> 1 . Analyze and redesign the signing and pavement markings for the full median opening <br /> and U-turn lane at Station 43 +00 . <br /> 2 . Analyze and redesign the signing and pavement markings for the four right turn lanes . <br /> 3 . Revise one plan sheet and update signing and pavement marking quantities . <br /> SECTION IV — TIME FOR COMPLETION <br /> Submittal Dates <br /> The 90% Design Drawing Submittal is moved four months after the Notice to Proceed is given for <br /> this Amendment. If the stormwater management pond locations change within this four month <br /> period, then the 90% Design Drawing Submittal will be moved forward to a time determined by the <br /> COUNTY and the ENGINEER. The stormwater management pond locations shall be determined by <br /> the COUNTY and the ENGINEER within one month from the Notice to Proceed of this Amendment. <br /> CR 510 Amendment 4 Page 2 of 4 12/9/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.