My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-297
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 1:23:42 PM
Creation date
9/30/2015 7:03:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/04/2003
Control Number
2003-297
Agenda Item Number
11.I.1
Entity Name
Florida Department of Transportation
Subject
Joint Participation Agreement 4th St. Widening
Area
US 1 from S. Relief Canal to N. of Indian River Boulevard
Project Number
FM 228583-3-58-01
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3489
Document Relationships
2003-141
(Attachment)
Path:
\Resolutions\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "A" <br /> Scope of Services <br /> US = 1 in Indian River County (228583 -3 ) <br /> The scope of the above project is to reconstruct US - 1 (SR- 5 ) from the South Relief Canal <br /> to north of 6`h Avenue from a 5 -lane undivided rural section to a 6-lane divided urban <br /> section . Other areas of major work are as follows : <br /> 1 . Construct sidewalk on both sides of the roadway . <br /> 2 . Provided a 4 ' bike lane on both sides of the roadway. <br /> 3 . Expand Indian River Blvd. / 4`h St . to provide triple lefts to southbound US - 1 . <br /> 4 . Construct mast arm signals at Indian River Blvd . and US - 1 intersection . <br /> 5 . Provide lighting . <br /> 6 . Provide landscaping. <br /> 7 . Construct closed drainage system. <br /> The work directly related to the JPA with Indian River County is the expansion of Indian <br /> River Blvd. / 4`h Street. The county has a project to expand 4`h Street and the railroad <br /> crossing at 4th Street . With the work we are doing we requested that they widen the road <br /> and crossing more than they had anticipated to line up with our expanded intersection . <br /> This extra work is the reason we are entering into a JPA with them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.