My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-394
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2016 1:35:33 PM
Creation date
9/30/2015 9:28:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/06/2005
Control Number
2005-394
Agenda Item Number
11.I.5
Entity Name
Florida East Coast Raliway, L.L.C.
Subject
Stipulation of Parties Open Highway-Rail Grade Crossing
Area
53rd St. , close 71st. St.(Cemetery Road)
Supplemental fields
SmeadsoftID
5301
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 . Upon completion of the crossing at 53`d Street, the RAILROAD , at the COUNTY' s <br /> expense , will be responsible for the maintenance of all trackbed and rail components , plus <br /> the highway roadbed , for the width of the rail ties within the license area . <br /> 13 . The RAILROAD , at the COUNTY' s expense will provide , furnish or have furnished , all <br /> necessary materials and install at the new highway railroad grade crossing at 53`d Street, <br /> automatic railroad grade crossing warning devices , Type IV, Class III (Cantilevers , <br /> Flashing Signals and Gates) , in accordance with the DEPARTMENT' s Standard Index No . <br /> 17882 , attached hereto and made a part hereof as Exhibit " E ." <br /> 14 . The RAILROAD , at the COUNTY' s expense , will be responsible for the maintenance of <br /> the automatic railroad grade crossing warning devices at 53`d Street. <br /> 15 . The COUNTY, at the COUNTY' s expense , will be responsible for the construction and <br /> maintenance of the 53`d Street highway roadbed outside of the railway ties and the <br /> roadway up to the edge of the railroad crossing surface to include but not limited to all <br /> pavement structure , pavement surface , shoulders , drainage , sidewalks , pavement <br /> striping , advance pavement markings , erosion control , tree cutting , mowing, and advance <br /> warning signs . <br /> 16 . The RAILROAD , at the COUNTY' s expense , will upgrade the existing North Gifford control <br /> point with new electronics and signal equipment that will integrate with the new 53`d Street <br /> grade crossing warning devices . The estimated cost of this work is $2101000 . 00 . <br /> 17 . All work by the COUNTY within the RAILROAD' s right-of-way will be coordinated with the <br /> RAILROAD to ensure that all applicable railroad requirements such as flagging , <br /> insurance , etc. are adhered to. All work will be consistent with current Manual of Uniform <br /> Traffic Control Devices ( MUTCD) , American Association of State Highway and <br /> Transportation Officials (AASHTO) Policy, and Manual of Uniform Minimum Standards for <br /> Design , Construction , and Maintenance for Streets and Highways (Florida's Green Book) . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.