Laserfiche WebLink
Page 2 . <br /> Mr . James W. Davis <br /> 2 . ) The County completes the new parallel roadway connecting the existing <br /> 71St Street (Cemetery:Road) ;;to .the existing 69. 1 Street-(North Winter <br /> Beaeh Rflad) and the '7151 Street (Cr . <br /> emetery Road) crossing is removed. <br /> 3 . ) The new 53r6 Street grade crossing is installed in conjunction with the 53rd <br /> Street roadway construction. <br /> As information, this crossing is in close proximity to our Gifford Control Point therefore <br /> there will be an additional cost for replacing the old antiquated equipment that will not <br /> facilitate the signal equipment and electronics associated with the new crossing . I <br /> estimate this cost to be somewhere between $ 100 , 000 . 00 to $ 150 , 000 . 00 . <br /> Should you have any questions or comments concerning this matter, I can be reached at <br /> ( 904) 826 -2383 . <br /> Sincerely, <br /> B y9 . <br /> Joseph L . Schonder <br /> Manager-Engineering Services <br /> cc : Mr. Charles Stone <br /> Mr. Andy Fowler <br /> Mr . Ron Crawford <br /> Ms . Janice Bordelon, FDOT <br />