Laserfiche WebLink
1 . 05 REVIEW OF DRAWINGS, PRODUCT DATA, WORKING DRAWINGS AND <br /> SAMPLES <br /> A. The review of drawings, data, and samples will be for general conformance with <br /> these Contract Documents . They shall not be construed : <br /> 1 * as permitting any departure from the Contract requirements ; <br /> 2 , as relieving the CONTRACTOR of responsibility for any errors , including <br /> details , dimensions , and materials ; <br /> 3 * as approving departures from details furnished by the ENGINEER, except <br /> as otherwise provided herein. <br /> B . The CONTRACTOR remains responsible for details and accuracy, for <br /> coordinating the work with all other associated work and trades, for selecting <br /> fabrication processes, for techniques of assembly, and for performing work in a <br /> safe manner. <br /> C . If the drawings, data or samples as submitted describe variations and show a <br /> departure from the Contract requirements which ENGINEER finds to be in the <br /> interest of the OWNER and to be so minor as not to involve a change in Contract <br /> Price or time for performance, the ENGINEER may return the reviewed drawings <br /> without noting an exception. <br /> D . Submittals will be returned to the CONTRACTOR under one of the following <br /> codes . <br /> Code 1 - " APPROVED " is assigned when there are no notations or comments on <br /> the submittal . When returned under this code the CONTRACTOR may <br /> release the equipment and/or material for manufacture . <br /> Code 2 - "APPROVED AS NOTED" is assigned when notations or comments have <br /> been made on the submittal pointing out minor discrepancies as compared <br /> with the Contract Documents . Resubmittal or confirmation is not <br /> necessary prior to release for manufacturing. <br /> Code 3 - "APPROVED AS NOTED/CONFIRM" . This combination of codes is <br /> assigned when a confirmation of the notations and comments is required by <br /> the CONTRACTOR. The CONTRACTOR may release the equipment or <br /> material for manufacture ; however, all notations and comments must be <br /> incorporated into the final product . This confirmation is to address the <br /> omissions and/or nonconforming items that were noted. Only the items to <br /> be " confirmed" need to be resubmitted. <br /> ire Code 4 - " APPROVED AS NOTED/RESUBMIT " . This combination of codes is <br /> assigned when notations and comments are extensive enough to require a <br /> resubmittal of the package . The Contractor may release the equipment or <br /> material for manufacture ; however, all notations and comments must be <br /> incorporated into the final product. This resubmittal is to address all <br /> comments, omissions and non-conforming items that were noted. <br /> Page 23 of 55 <br />