My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-399B
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-399B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 1:31:57 PM
Creation date
10/1/2015 1:09:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/09/2008
Control Number
2008-399B
Agenda Item Number
8.A.
Entity Name
Summerlin Marine Construction
Subject
Moorings Club & Indian River County Seawall Cost Sharing
Bid Number
2008070
Supplemental fields
SmeadsoftID
8196
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERY, STORAGE AND HANDLING <br /> PART 1 : GENERAL <br /> 1 .01 SCOPE OF WORK <br /> A. This Section specifies the general requirements for the delivery handling, storage <br /> and protection for all items required in the construction of the work. Specific <br /> requirements, if any, are specified with the related item . <br /> 1 . 02 TRANSPORTATION AND DELIVERY <br /> A. Transport and handle items in accordance with manufacturer' s instructions . <br /> B . Schedule delivery to reduce long-term on- site storage prior to installation and/or <br /> operation. Under no circumstances shall materials or equipment be delivered to <br /> the site more than one month prior to installation without written authorization <br /> from the Engineer. <br /> C . Coordinate delivery with installation to ensure minimum holding time for items <br /> that are hazardous, flammable, easily damaged, an environmental hazard, or <br /> sensitive to deterioration. <br /> D . Deliver products to the site in manufacturer's original sealed containers or other <br /> packing systems , complete with instructions for handling, storing, unpacking, <br /> protecting and installing. <br /> E . All items delivered to the site shall be unloaded and placed in a manner, which will <br /> not hamper the Contractor' s normal construction operation or and will not interfere <br /> with the flow of necessary traffic or create a public hazard or obstruction to public <br /> traffic . <br /> F . Provide necessary equipment and personnel to unload all items delivered to the <br /> site. <br /> G. Promptly inspect shipment to assure that products comply with requirements , <br /> quantities are correct, and items are undamaged . Notify Engineer verbally, and in <br /> writing, of any problems . <br /> 1 .03 STORAGE AND PROTECTION <br /> A. Store and protect products in accordance with the manufacturer's instructions, with <br /> seals and labels intact and legible. Storage instruction shall be studied by the <br /> Contractor and reviewed with the engineer by him/her. Instruction shall be <br /> ., carefully followed and a written record of this kept by the Contractor. Arrange <br /> storage to permit access for inspection. <br /> Page 26 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.