My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 . Contract Price--The moneys payable by <br /> • OWNER to CONTRACTOR for completion of the Work in 24 . Hazardous Waste--The term Hazardous <br /> accordance with the Contract Documents as stated in the Waste shall have the meaning provided in Section 1004 of <br /> Agreement (subject to the provisions of paragraph 11 . 03 in the Solid Waste Disposal Act (42 USC Section 6903 <br />) as <br /> the case of Unit Price Work) . amended from time to time . <br /> 14 . Contract Times--The number of days or the 25 . Laws and Regulations; Laws or Regulations-- <br /> dates stated in the Agreement to : (i) achieve Substantial Any and all applicable laws, rules, regulations , <br /> ordinances, <br /> Completion; and (ii) complete the Work so that it is ready codes, and orders of any and all governmental <br /> bodies, <br /> for final payment as evidenced by ENGINEER 's written agencies, authorities, and courts having jurisdiction. <br /> recommendation of final payment. <br /> 26. Liens--Charges, security interests, or <br /> 15 . CONTRACTOR—The individual or entity with encumbrances upon Project funds, real property, or personal <br /> whom OWNER has entered into the Agreement. property. <br /> 16. Cost of the Work--See paragraph 1 LOLA for 27 . Milestone--A principal event specified in the <br /> definition. Contract Documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the <br /> 17 . Drawings--That part of the Contract Work. <br /> Documents prepared or approved by ENGINEER which <br /> graphically shows the scope, extent, and character of the 28 . Notice of Award--The written notice by <br /> Work to be performed by CONTRACTOR. Shop OWNER to the apparent successful bidder stating that upon <br /> Drawings and other CONTRACTOR submittals are not timely compliance by the apparent successful bidder with <br /> Drawings as so defined. the conditions precedent listed therein, OWNER will sign <br /> and deliver the Agreement. <br /> 18 . Effective Date of the Agreement--The date <br /> indicated in the Agreement on which it becomes effective, 29 . Notice to Proceed--A written notice given by <br /> • but if no such date is indicated, it means the date on which OWNER to CONTRACTOR fixing the date on which the <br /> the Agreement is signed and delivered by the last of the two Contract Times will commence to run and <br /> on which <br /> parties to sign and deliver. CONTRACTOR shall start to perform the Work under the <br /> Contract Documents . <br /> 19 . ENGINEER--The individual or entity named <br /> as such in the Agreement. 30. OWNER--The individual, entity, public body, <br /> or authority with whom CONTRACTOR has entered into <br /> 20 . ENGINEER 's Consultant--An individual or the Agreement and for whom the Work is to be performed. <br /> entity having a contract with ENGINEER to famish <br /> services as ENGINEER' s independent professional 31 . Partial Utilization--Use by OWNER of a <br /> associate or consultant with respect to the Project and who substantially completed part of the Work for the purpose for <br /> is identified as such in the Supplementary Conditions. which it is intended (or a related purpose) prior <br /> to <br /> Substantial Completion of all the Work. <br /> 21 . Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the Work but 32 . PCBs--Polychlorinated biphenyls . <br /> which does not involve a change in the Contract Price or the <br /> Contract Times . 33 . Petroleum--Petroleum, including crude oil or <br /> any fraction thereof which is liquid at standard conditions of <br /> 22 . General Requirements--Sections of Division temperature and pressure (60 degrees Fahrenheit and 14 . 7 <br /> 1 of the Specifications . The General Requirements pertain pounds per square inch absolute), such as oil, petroleum, <br /> to all sections of the Specifications . fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil <br /> mixed with other non-Hazardous Waste and crude oils . <br /> 23 . Hazardous Environmental Condition--The <br /> presence at the Site of Asbestos , PCBs, Petroleum, 34 . Project--The total construction of which the <br /> Hazardous Waste, or Radioactive Material in such Work to be performed under the Contract Documents may <br /> quantities or circumstances that may present a substantial be the whole, or a part as may be indicated elsewhere in <br />the <br /> danger to persons or property exposed thereto in connection Contract Documents . <br /> with the Work. <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.