My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 7 - OTHER WORK integration with CONTRACTOR ' s Work except for latent <br /> • defects and deficiencies in such other work. <br /> 7 . 01 Related Work at Site 7 . 02 Coordination <br /> A . OWNER may perform other work related to the A . If OWNER intends to contract with others for the <br /> Project at the Site by OWNER ' s employees, or let other performance of other work on the Project at the <br />Site, the <br /> direct contracts therefor, or have other work performed by following will be set forth in Supplementary Conditions : <br /> utility owners . If such other work is not noted in the Con- <br /> tract Documents, then: 1 . the individual or entity who will have <br /> authority and responsibility for coordination of the <br /> 1 . written notice thereof will be given to activities among the various contractors will <br /> be <br /> CONTRACTOR prior to starting any such other identified; <br /> work; and <br /> 2 . the specific matters to be covered by such <br /> 2 . if OWNER and CONTRACTOR are authority and responsibility will be itemized; and <br /> unable to agree on entitlement to or on the amount <br /> or extent, if any, of any adjustment in the Contract 3 . the extent of such authority and responsi- <br /> Price or Contract Times that should be allowed as a bilities will be provided. <br /> result of such other work, a Claim may be made <br /> therefor as provided in paragraph 10 . 05 . B . Unless otherwise provided in the Supplementary <br /> Conditions, OWNER shall have sole authority and respon- <br /> B . CONTRACTOR shall afford each other contractor sibility for such coordination. <br /> who is a party to such a direct contract and each utility <br /> owner (and OWNER, if OWNER is performing the other <br /> work with OWNER' s employees) proper and safe access to ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> the Site and a reasonable opportunity for the introduction <br /> • and storage of materials and equipment and the execution of <br /> such other work and shall properly coordinate the Work 8 . 01 Communications to Contractor <br /> with theirs . Unless otherwise provided in the Contract <br /> Documents, CONTRACTOR shall do all cutting, fitting, A. Except as otherwise provided in these General <br /> and patching of the Work that may be required to properly Conditions, OWNER shall issue all communications to <br /> connect or otherwise make its several parts come together CONTRACTOR through ENGINEER. <br /> and properly integrate with such other work. CON- <br /> TRACTOR shall not endanger any work of others by 8 . 02 Replacement of ENGINEER <br /> cutting, excavating, or otherwise altering their work and will <br /> only cut or alter their work with the written consent of Part of paragraph 8.02 .A has been deleted. <br /> ENGINEER and the others whose work will be affected. A. In case of termination of the employment of <br /> The duties and responsibilities of CONTRACTOR under ENGINEER, OWNER shall appoint an engineers <br /> this paragraph are for the benefit of such utility owners and CONTRACTOR makes no e ,.., . ble obje do whose <br /> other contractors to the extent that there are comparable status under the Contract Documents shall be that <br /> of the <br /> provisions for the benefit of CONTRACTOR in said direct former ENGINEER. <br /> contracts between OWNER and such utility owners and <br /> other contractors. 8 .03 Furnish Data <br /> C. If the proper execution or results of any part of A. OWNER shall promptly furnish the data required <br /> CONTRACTOR' s Work depends upon work performed by of OWNER under the Contract Documents . <br /> others under this Article 7, CONTRACTOR shall inspect <br /> such other work and promptly report to ENGINEER in 8 . 04 Pay Promptly When Due <br /> writing any delays, defects, or deficiencies in such other <br /> work that render it unavailable or unsuitable for the proper A . OWNER shall make payments to CONTRACTOR <br /> execution and results of CONTRACTOR' s Work. promptly when they are due as provided in paragraphs <br /> CONTRACTOR' s failure to so report will constitute an 14 . 02 . 0 and 14 .07 . C. <br /> acceptance of such other work as fit and proper for <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.