under the terms and conditions governing final payment, <br /> B . Review of Application and Acceptance except that it shall not constitute a waiver of Claims . <br /> 1 . If, on the basis of ENGINEER' s observa- 14 . 09 Waiver of Claims <br /> tion of the Work during construction and final <br /> inspection, and ENGINEER ' s review of the final Paragraph 14.09 has been deleted and replaced in <br />its <br /> Application for Payment and accompanying docu- entirety with a new paragraph. See the Supplementary <br /> mentation as required by the Contract Documents, Conditions. <br /> ENGINEER is satisfied that the Work has been A. The making a a .. <br /> o +. nee of final payment <br /> completed and CONTRACTOR' s other obligations ^��t <br /> under the Contract Documents have been fulfilled, <br /> ENGINEER will, within ten days after receipt of the <br /> final Application for Payment, indicate in writing <br /> ENGINEER ' s recommendation of payment and from 2hn^ ,tied Lieffi, fF M def et W r <br /> appear- <br /> present the Application for Payment to OWNER for ing after- final <br /> payment. At the same time ENGINEER will also t ^ n6 from failufe t eemply <br /> l <br /> th t G «. <br /> give written notice to OWNER and CON- Dee offtsor- the tenns ofany _ , _ cel <br /> TRACTOR that the Work is acceptable subject to speeified therein, OF from GQQqZAGTOR-, <br /> the provisions of paragraph 14 . 09 . Otherwise, n finui a,. obligations a t Gentmet n <br /> oeu <br /> ENGINEER will return the Application for Payment me_�� *� <br /> to CONTRACTOR, indicating in writing the reasons <br /> for refusing to recommend final payment, in which 2 . a 3ATaiyvreF e f all Glai ..... by CONTRAG <br /> case CONTRACTOR shall make the necessary TOR agaiimt O;Vn >~n other- than t Y l <br /> corrections and resubmit the Application for made is o.==ang 1 ie rare stilxi za settled , <br /> Payment. <br /> Paragraph 14 .07.C . 1 has been deleted and replaced with ARTICLE 15 - SUSPENSION OF WORK AND <br /> • a new paragraph. See the Supplementary Conditions. TERMINATION <br /> C . Payment Becomes Due <br /> 1 . Thirty days after- the presentation to 15 . 01 OWNER May Suspend Work <br /> O R of the Applisatien fer Payment an <br /> aeseiripany . deeu ientatien, the amewnt The last sentence of Paragraph 15.01 .A has been deleted <br /> Feeemmw ded by >rrrr-PME 11 beeeme a a and replaced with new sentences. See the <br /> - aur u v <br /> f <br /> �v en due,will bepaidby 0303 R to GvvrN Supplementary Conditions. <br /> TRACTOR. A . At any time and without cause, OWNER may <br /> suspend the Work or any portion thereof for a period of not <br /> 14 . 08 Final Completion Delayed more than 90 consecutive days by notice in writing to CON- <br /> TRACTOR and ENGINEER which will fix the date on <br /> A. If, through no fault of CONTRACTOR, final which Work will be resumed. CONTRACTOR shall <br /> completion of the Work is significantly delayed, and if resume the Work on the date so fixed. CONTRACTOR <br /> ENGINEER so confirms, OWNER shall, upon receipt of shall be alloNved an adjustment in the r t Pfiee OF <br /> CONTRACTOR's final Application for Payment and <br /> recommendation of ENGINEER, and without terminating attributable tea y sueh suspem en if GQN D ^ GTOR <br /> the Agreement, make payment of the balance due for that mmkes a Claim they-efef as pFevided in pafagr-aph 10 .05 . <br /> portion of the Work fully completed and accepted. If the <br /> remaining balance to be held by OWNER for Work not 15 . 02 OWNER May Terminate for Cause <br /> fully completed or corrected is less than the retainage <br /> stipulated in the Agreement, and if Bonds have been A. The occurrence of any one or <br /> more of the <br /> furnished as required in paragraph 5 . 01 , the written consent following events will justify termination for cause : <br /> of the surety to the payment of the balance due for that <br /> portion of the Work fully completed and accepted shall be 1 . CONTRACTOR' s persistent failure to <br /> submitted by CONTRACTOR to ENGINEER with the perform the Work in accordance with the Contract <br /> • Application for such payment. Such payment shall be made Documents (including, but not limited to, failure to <br /> supply sufficient skilled workers or suitable materi- <br /> IRC OPERATIONS COMPLEX 00700 - Standard General Conditions of the Construction Contract <br /> 00700 -43 <br />