Laserfiche WebLink
due the CONTRACTOR . <br /> 6 . No work shall commence before 7 a . m . or continue after 7 p . m . except in case of <br /> emergency upon specific permission of the ENGINEER . <br /> SC -6 . 05 Substitutes and " Or- Equals " <br /> SC-6 . 05 . A Delete paragraph GC-6. 05. A in its entirety and insert the following in its place: <br /> A . Whenever an item of material or equipment is specified or described in the Con- <br /> tract Documents by using the name of a proprietary item or the name of a <br /> particular Supplier, that proprietary item or particular Supplier shall be used and no <br /> other will be considered . If the specification or description contains or is followed <br /> by words such as "equivalent" or "or-equal , " then the specification or description is <br /> intended to establish the type ,, function , appearance , and quality required . In such <br /> case , substitution of other items of material or equipment or material or equipment <br /> of other Suppliers may be submitted to ENGINEER for review under the circum- <br /> stances described below. <br /> SC-6 . 05 .A . 1 . a . (ii ) Delete sentence GC-6. 05. A . 1 . a. (ii) in its entirety and insert the following in <br /> its place: <br /> ( ii ) it will reliably perform at least equally well the function of the named item of <br /> material or equipment , and ; <br /> SC -6 . 06 Concerning Subcontractors , Suppliers , and Others <br /> • SC-6 . 06 . C . Add the following sentence at the end of paragraph GC-6. 06. C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity, to the extent practicable , information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity . <br /> SC -6 . 08 Permits <br /> SC-6 . 08 Add the following paragraphs immediately after paragraph GC- 6. 08. A : <br /> B . The OWNER shall obtaine the following permits (copies of these permits and <br /> their applicable conditions will be provided to the CONTRACTOR) . <br /> 1 ) Indian River County Land Clearing Permit <br /> 2 ) Indian River County Tree Removal Permit <br /> 3 ) Indian River County Concurrency <br /> 4 ) Indian River County Type "A" Stormwater Permit <br /> 5 ) Indian River County Right-of-Way Permit <br /> 6 ) SJRWMD Environmental Resource Permit <br /> 7 ) IRFWCD Connection Permit <br /> 8 ) FDEP Water Extension General Permit <br /> 9 ) FDEP Wastewater System General Permit <br /> 10 ) Species of Concern , " Incidental Take" ( If Required ) <br /> • C . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> IRC OPERATIONS COMPLEX 00800 — Supplemental Conditions <br /> 00800 - 7 <br />