My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-033
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:00:33 PM
Creation date
9/30/2015 7:40:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/18/2005
Control Number
2005-033
Agenda Item Number
11.J.1
Entity Name
Summit Construction
Subject
Utilities Operations Complex Change Order No. 1
Area
Operations Complex
Project Number
6037
Bid Number
7026
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3869
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
746
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01000 <br /> SUMMARY OF WORK <br /> PART 1 -- GENERAL <br /> 1 . 01 LOCATION OF WORK <br /> The work is generally located on 20 acres in the Northwest corner of 43rd Avenue <br /> and 41S` Street in Indian River County , Florida . <br /> 1 . 02 DESCRIPTION OF WORK <br /> Provide all labor , equipment , materials , facilities and services to complete the <br /> following : clear and grub approximately 19 . 5 acres of overgrown citrus grove ; <br /> excavate approximately 27 , 000 c . y . of dry material and 19 , 500 c . y . of "wet" <br /> material with all soils to be kept on - site ; stockpile and exchange approximately <br /> 12 , 500 c . y . of unsuitable fill material with excavated "wet" material ; import <br /> • approximately 3 , 000 c . y . of general fill ; grade and shape entire 19 . 5 ± acres ; <br /> prepare two building pads with total footprints of approximately 31 , 379 s . f . ; <br /> underground sewer , potable water , electric service , communications and <br /> irrigation ; approximately 22 , 703 s . y . of asphalt pavement and 1 , 445 s . y . of <br /> concrete pavement with associated subgrades and base ; sidewalk ; equipment <br /> pads and equipment ; site lighting ; traffic control and parking spaces ; fencing and <br /> access control ; sodding , seeding , mulching and landscaping ; one 19 , 649 s . f . <br /> metal framed warehouse ; and one 11 , 730 s . f metal framed office building . <br /> PART 2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> END OF SECTION <br /> • <br /> IRC OPERATIONS COMPLEX 01000- Summary Of Work <br /> 01000 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.