Laserfiche WebLink
C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost, progress , and performance of the Work . <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or <br /> relating to existing surface or subsurface structures at or contiguous to the Site (except <br /> Underground Facilities) which have been identified in the Supplementary Conditions as <br /> provided in paragraph 4 . 02 of the General Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all investigations , explorations , tests , studies , and data concerning conditions <br /> (surface , subsurface , and Underground Facilities ) at or contiguous to the Site which may <br /> affect cost, progress , or performance of the Work or which relate to any aspect of the means , <br /> methods , techniques , sequences , and procedures of construction to be employed by <br /> CONTRACTOR , including applying the specific means , methods , techniques , sequences , and <br /> procedures of construction , if any, expressly required by the Contract Documents to be <br /> employed by CONTRACTOR , and safety precautions and programs incident thereto <br /> F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents . <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> • H . CONTRACTOR has correlated the information known to CONTRACTOR , information and <br /> observations obtained from visits to the Site , reports and drawings identified in the Contract <br /> Documents , and all additional examinations , investigations , explorations , tests , studies , and <br /> data with the Contract Documents . <br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the written <br /> resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of <br /> all terms and conditions for performance and furnishing of the Work . <br /> ARTICLE 9 = CONTRACT DOCUMENTS <br /> 9 . 01 Contents <br /> A. The Contract Documents consist of the following : <br /> 1 . This Agreement (pages 00520- 1 to 00520-7 , inclusive ) ; <br /> 2 . Performance Bond (pages 00610- 1 to 00610-6 , inclusive ) ; <br /> 3 . Payment Bond ( pages 00612- 1 to 00612-6 , inclusive) ; <br /> • 4 . Other Bonds (pages N/A to N/A , inclusive ) ; <br /> IRC OPERATIONS COMPLEX 00520 - Agreement <br /> 00520 - 4 <br />