My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-087
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 10:50:40 AM
Creation date
9/30/2015 7:29:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/13/2004
Control Number
2004-087
Agenda Item Number
11.J.3
Entity Name
Sunland Development Inc.
Subject
Lift Station and Gravity Sewer Systems
Diamond Lakes Subdivision
Area
5225 9th St.SW
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3737
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 AGREEMENT 1 <br /> BETWEEN <br /> INDIAN RIVER COUNTY, FLORIDA <br /> AND <br /> SUNLAND DEVELOPMENT, INC. <br /> FOR THE CONSTRUCTION OF A REGIONAL LIFT STATION <br /> ASSOCIATED GRAVITY SEWER SYSTEMS <br /> THIS AGREEMENT by and between INDIAN RIVER COUNTY, a political subdivision ofthe State of <br /> Florida, the address of which is 1840 25th Street, Vero Beach, Florida 32960 (hereinafter the "COUNTY") <br /> and SUNLAND DEVELOPMENT, INC., the address of which is 6823 Vista Parkway N. West Palm Beach, <br /> FL 33411 , (hereinafter the DEVELOPER) is effective upon execution by the second of the two parties. <br /> WHEREAS, the DEVELOPER, in conjunction with the construction improvements at Diamond Lake <br /> Subdivision, is providing water and wastewater facilities to serve the subject property located at 5225 91' Street <br /> S .W. , and more specifically described in Exhibit "A"; and <br /> WHEREAS, pursuant to Section 918. 05, The Code of Indian River County (Ordinance 9046, as <br /> amended), the COUNTY, requires the DEVELOPER to provide the utility improvements to serve the regional <br /> area, and agrees to reimburse the DEVELOPER, as provided herein, for the cost of providing these Regional <br /> Lift Station and Associated Gravity Sewer System hereinafter the LIFT STATION. <br /> NOW, THEREFORE, for and in consideration of the mutual promises set forth herein and other good and <br /> valuable consideration, the COUNTY and DEVELOPER agree as follows: <br /> 1 a. REGIONAL SEWAGE COLLECTION / TRANSMISSION SYSTEM: <br /> The DEVELOPER shall construct a Regional Sewage Lift Station, Gravity Sewers, Force Mains and all other <br /> necessary appurtenances as directed by the Indian River County Department of Utility Services during the <br /> construction of Phase I of the Diamond Lake Subdivision, as illustrated in Exhibits "B" and "C". <br /> Reimbursement: The estimated cost of the Regional Sewer System is shown in Exhibit ` D' . The COUNTY <br /> shall reimburse the DEVELOPER for funds advanced by DEVELOPER to construct regional facilities as <br /> requested by Indian River County Department of Utility Services based upon an equitable reimbursement <br /> formula using the service area shown in Exhibit "C", and the actual cost of the Regional Sewer System based <br /> on an itemized invoice of the installed material at the time the Regional Sewer System is dedicated to and <br /> accepted by the COUNTY. The funds to reimburse the COUNTY shall derive from the connection charges of <br /> other properties that use the constructed lines and facilities based on their share of ERU ' s as outlined in the <br /> table below. The COUNTY shall reimburse the DEVELOPER based on an itemized invoice of the installed <br /> material on a complete monthly basis (less 10% retainage), with final payment and release of retainage at the <br /> time the above referenced facilities are dedicated to and accepted by the County. Reimbursement shall be in <br /> the form of a check from the COUNTY. The ERU's and percentages shown in the table below are based upon <br /> the actual units proposed for construction in Diamond Lakes Subdivision. The two parcels (Parcel #2 and #3 <br /> as shown on Exhibit "C') are currently zoned AG and are presumed to be capable of developing at RS-3 in the <br /> future with an average density of 1 . 53 units/acre. Parcel #4 is Four Lakes Subdivision, which has the potential <br /> for 58 ERU' s single-family residential units. <br /> The Sewage Collection/Transmission System is comprised of three primary parts, herein designation as D- 1 , <br /> D-2 and D-3 . D4 is the common lift station, force main and associated appurtenances that are shared amongst <br /> four benefiting parcels. 13-2 is a gravity sewer system that is shared amongst three adjoining parcels. D-3 is <br /> another gravity sewer line that is shared amongst three adjoining parcels. <br /> Page 1 <br /> C:�DO(.'Ul�N'ISAND SECfINGS�i11ACAL SEITAIGS'[FAPORARY IIi7F1tNEf - DEVELOPERS AGREEA42J'C - OFFSITE UTQ.ITMS MARCH 15 2(IMIDOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.