Laserfiche WebLink
EXHIBIT D-1 : Regional Lift Station Force Main & Gravity Sewer Serving Parcels 14 24 3& 4 <br /> Description Est. Quantity Unit of Measure Unit Price Total Price <br /> Mobilization 1 LS 9,494.49 9,494.49 <br /> Maintenance of Traffic on Oslo Rd. 1 LS 19800.00 15800.00 <br /> 6" PVC FM / fittings 3 ,628 LF 15.00 545420.00 <br /> Lift Station & Concrete Drive 1 EA 1000000.00 1001000 .00 <br /> 8" PVC gravity sewer 55 LF 29.50 19622 .50 <br /> Manholes 2 EA 7 000.00 14 000.00 <br /> 6" PE Directional Bore 1 LF 61000.00 61000.00 <br /> Inspection/testingInspection/testing 1 LS 696.26 696 .26 <br /> Restoration / grading, etc. on Oslo Rd. 600 LF 3 .50 2 . 100.00 <br /> Surve / construction staking 1 LS 17265 .93 12265 . 93 <br /> Subtotal 1919399. 18 <br /> Contin enc 10% 199139.92 <br /> Route Surve / As-Built 39915.36 <br /> Design 225967.90 <br /> Pprm;ff;" n. 1 ,912. 99 <br /> Bidding & Award 35827.98 <br /> Services During Construction 2,680.60 <br /> Administration 39827.98 <br /> Total Im rovement Cost $2499671 .91 <br /> EXHIBIT D4 : Gravity Sewer Serving Parcels 1 2 & 3 <br /> Description Est. Quantitv Unit of Measure Unit Price Total Price <br /> Mobilization 1 LS 11502.96 1 ,502.96 <br /> 8" PVC GRAVITY SEWER 491 LS 29. 50 149484 .50 <br /> MANHOLES 2 EA 79000.00 14,000.00 <br /> INSPECTION/TESTING 1 LS 1 110.00 110.22 <br /> Surve Lay-out 1 LS 200.39 200.39 <br /> Subtotal 309298. 07 <br /> Contin enc 10% 3 ,029. 81 <br /> Route Survey / As-Built 618 .54 <br /> Design 31635 .77 <br /> Permitting 302.98 <br /> Bidding & Award 605 .96 <br /> Services During Construction 424. 17 <br /> Administration 605.96 <br /> Total Improvement Cost-L- $39,521 .26 <br /> EXHIBIT D-3: Gravity Sewer Serving Parcels 1 & 4 <br /> Descri tion Est. OualltWY Unit of Measure Unit Price Total Price <br /> Mobilization 1 LS 4,002 .55 4,002 .55 <br /> 8" PVC GRAVITY SEWER 1 ,385 .00 LF 29.50 409857.50 <br /> MANHOLES 5 EA 7,000.00 35,000.00 <br /> INSPECTION/TESTING 1 LS 293 .52 293 .52 <br /> S2ng La -Out 1 LS 533 .67 533 .67 <br /> Subtotal 807687.24 <br /> Contingency 10% 8,068.75 <br /> Route Surve / As-Built 11651 .75 <br /> Design 99682.75 <br /> Permitting 806.93 <br /> Bidding & Award 19613 .00 <br /> Services py ng Construction 1 , 129. 75 <br /> Administration 19613 . 75 <br /> Total Im rovement Cost $ 105 ,253 .92 <br /> C:IDOCL%dMS AMID SETTIN63%GKEHV,OCAL SETTINGSITEMPORARY R;TERNET FOYS�53%GREEMENf • DEVE(APFRS AGREEb4ENT - OFF-SITE LrMXn ;S MARCH 15 20041.DOC <br />