My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-011
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 1:51:01 PM
Creation date
10/1/2015 12:51:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/13/2009
Control Number
2009-011
Agenda Item Number
8.J.
Entity Name
Timorthy Rose Contracting
Subject
129th Place Subdivision Water Assessment Project
Area
129th. Place
Supplemental fields
SmeadsoftID
7747
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT oc v ` <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> 129 ' PLACE SUBDIVISION WATER ASSESSMENT PROJECT <br /> THIS AGREEMENT ("Agreement" or "Contract') , dated thet/ <br /> ___ __day oin the <br /> f <br /> year 20Qq by and between Indian River County, a political subdivisio of the Sta a of Florida <br /> (hereinafter called OWNER) and Timothy Rose Contracting, Inc (hereinafter called <br /> CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , agree <br /> as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows: <br /> Furnish and install about 640 LF of 6" PVC water main , 140 LF of 4" PVC water <br /> main , 80 LF of 4" HDPE Directional Bore , 1 fire hydrant, 11 water services and <br /> restoration . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Gordon E . Sparks , P. E . , hereinafter called ENGINEER, and who <br /> is to act as OWNER'S representative, assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents, <br /> ARTICLE 3 CONTRACT TIME <br /> 3. 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor, equipment, and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> (b ) From 16 calendar days to 45 calendar days from the effective date of Notice to <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.