My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' construction and safety precautions and from the requirements of the Contract Documents <br /> programs incident thereto ; and unless CONTRACTOR has in writing called <br /> ENGINEER' s attention to each such variation at the <br /> ' d. CONTRACTOR shall also have time of each submittal as required by paragraph <br /> reviewed and coordinated each Shop Drawing or 6 . 17.D .3 and ENGINEER has given written <br /> Sample with other Shop Drawings and Samples approval of each such variation by specific written <br /> ' and with the requirements of the Work and the notation thereof incorporated in or accompanying <br /> Contract Documents. the Shop Drawing or Sample approval ; nor will any <br /> approval by ENGINEER relieve CONTRACTOR <br /> 2 . Each submittal shall bear a stamp or from responsibility for complying with the require- <br /> specific written indication that CONTRACTOR has ments of paragraph 6. 17 .D. 1 . <br /> satisfied CONTRACTOR' s obligations under the <br /> Contract Documents with respect to F . Resubmittal Procedures <br /> ' CONTRACTOR' s review and approval of that <br /> submittal. 1 . CONTRACTOR shall make corrections <br /> required by ENGINEER and shall return the <br /> ' 3 . At the time of each submittal, CON- required number of corrected copies of Shop <br /> TRACTOR shall give ENGINEER specific written Drawings and submit as required new Samples for <br /> notice of such variations, if any, that the Shop Draw- review and approval. CONTRACTOR shall direct <br /> ing or Sample submitted may have from the require- specific attention in writing to revisions other than <br /> ' ments of the Contract Documents, such notice to be the corrections called for by ENGINEER on previ- <br /> in a written communication separate from the ous submittals . <br /> submittal; and, in addition, shall cause a specific <br /> ' notation to be made on each Shop Drawing and New Paragraph 6. 17.G has been added. See <br /> the <br /> Sample submitted to ENGINEER for review and Supplementary Conditions, <br /> approval of each such variation. <br /> 6. 18 Continuing the Work <br /> ' E. ENGINEER 'S Review <br /> A. CONTRACTOR shall carry on the Work and <br /> 1 . ENGINEER will timely review and adhere to the progress schedule during all disputes or <br /> ' approve Shop Drawings and Samples in accordance disagreements with OWNER. No Work shall be delayed or <br /> with the schedule of Shop Drawings and Sample postponed pending resolution of any disputes or <br /> submittals acceptable to ENGINEER. disagreements, except as permitted by paragraph 15 .04 or as <br /> ENGINEER's review and approval will be only to OWNER and CONTRACTOR may otherwise agree in <br /> ' determine if the items covered by the submittals will, writing. <br /> after installation or incorporation in the Work, con- <br /> form to the information given in the Contract Docu- 6 . 19 CONTRACTOR 's General Warranty and <br /> ments and be compatible with the design concept of Guarantee <br /> the completed Project as a functioning whole as <br /> indicated by the Contract Documents . A. CONTRACTOR warrants and guarantees to <br /> ' OWNER, ENGINEER, and ENGINEER ' s Consultants that <br /> 2 . ENGINEER' s review and approval will all Work will be in accordance with the Contract Docu- <br /> not extend to means, methods, techniques, ments and will not be defective . CONTRACTOR' s <br /> sequences, or procedures of construction (except warranty and guarantee hereunder excludes defects or <br /> ' where a particular means, method, technique, damage caused by: <br /> sequence, or procedure of construction is <br /> specifically and expressly called for by the Contract 1 . abuse, modification, or improper main- <br /> Documents) or to safety precautions or programs tenance or operation by persons other than CON- <br /> incident thereto. The review and approval of a TRACTOR, Subcontractors, Suppliers, or any other <br /> separate item as such will not indicate approval of individual or entity for whom CONTRACTOR is <br /> the assembly in which the item functions. responsible; or <br /> ' 3 . ENGINEER' s review and approval of 2 . normal wear and tear under normal <br /> Shop Drawings or Samples shall not relieve CON- usage. <br /> ' TRACTOR from responsibility for any variation <br /> ' 00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.