' 2 . Cost of all materials and equipment fur- rental agreements approved by OWNER with the
<br /> nished and incorporated in the Work, including costs advice of ENGINEER, and the costs of
<br /> of transportation and storage thereof, and Suppliers ' transportation, loading, unloading, assembly,
<br /> ' field services required in connection therewith. All dismantling, and removal thereof. All such costs
<br /> cash discounts shall accrue to CONTRACTOR shall be in accordance with the terms of said rental
<br /> unless OWNER deposits funds with agreements. The rental of any such equipment, ma-
<br /> CONTRACTOR with which to make payments, in chinery, or parts shall cease when the use thereof is
<br /> which case the cash discounts shall accrue to no longer necessary for the Work.
<br /> OWNER. All trade discounts, rebates and refunds
<br /> ' and returns from sale of surplus materials and d. Sales, consumer, use, and other similar
<br /> equipment shall accrue to OWNER, and taxes related to the Work, and for which CON-
<br /> CONTRACTOR shall make provisions so that they TRACTOR is liable, imposed by Laws and Regu-
<br /> may be obtained. lations.
<br /> 3 . Payments made by CONTRACTOR to e . Deposits lost for causes other than negli-
<br /> Subcontractors for Work performed by gence of CONTRACTOR, any Subcontractor, or
<br /> ' Subcontractors. If required by OWNER, CON- anyone directly or indirectly employed by any of
<br /> TRACTOR shall obtain competitive bids from them or for whose acts any of them may be liable,
<br /> subcontractors acceptable to OWNER and CON- and royalty payments and fees for permits and
<br /> TRACTOR and shall deliver such bids to OWNER, licenses .
<br /> ' who will then determine, with the advice of ENGI-
<br /> NEER, which bids, if any, will be acceptable. If any f. Losses and damages (and related expenses)
<br /> subcontract provides that the Subcontractor is to be caused by damage to the Work, not compensated by
<br /> paid on the basis of Cost of the Work plus a fee, the insurance or otherwise, sustained by
<br /> Subcontractor' s Cost of the Work and fee shall be CONTRACTOR in connection with the perfor-
<br /> determined in the same manner as mance of the Work (except losses and damages
<br /> CONTRACTOR' s Cost of the Work and fee as within the deductible amounts of property insurance
<br /> provided in this paragraph 11 .01 . established in accordance with paragraph 5 .06.D),
<br /> provided such losses and damages have resulted
<br /> 4 . Costs of special consultants (including from causes other than the negligence of
<br /> ' but not limited to engineers, architects, testing CONTRACTOR, any Subcontractor, or anyone
<br /> laboratories, surveyors, attorneys, and accountants) directly or indirectly employed by any of them or for
<br /> employed for services specifically related to the whose acts any of them may be liable. Such losses
<br /> Work. shall include settlements made with the written
<br /> consent and approval of OWNER. No such losses,
<br /> 5 . Supplemental costs including the damages, and expenses shall be included in the Cost
<br /> following: of the Work for the purpose of detemmining
<br /> CONTRACTOR' s fee .
<br /> a. The proportion of necessary trans-
<br /> portation, travel, and subsistence expenses of g. The cost of utilities, fuel, and sanitary
<br /> CONTRACTOR' s employees incurred in discharge facilities at the Site .
<br /> of duties connected with the Work.
<br /> h. Minor expenses such as telegrams, long
<br /> b . Cost, including transportation and main- distance telephone calls, telephone service at the
<br /> ' tenance, of all materials, supplies, equipment, Site, expressage, and similar petty cash items in
<br /> machinery, appliances, office, and temporary facili- connection with the Work.
<br /> ties at the Site, and hand tools not owned by the
<br /> ' workers, which are consumed in the performance of i. When the Cost of the Work is used to
<br /> the Work, and cost, less market value, of such items determine the value of a Change Order or of a
<br /> used but not consumed which remain the property of Claim, the cost of premiums for additional Bonds
<br /> CONTRACTOR. and insurance required because of the changes in the
<br /> ' Work or caused by the event giving rise to the
<br /> C . Rentals of all construction equipment and Claim.
<br /> machinery, and the parts thereof whether rented
<br /> ' from CONTRACTOR or others in accordance with
<br /> 00700 - 33
<br />
|