My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
graphs 1-2 . 01 . G . 2 . a—direugh 2 . 01 . G . 2 .e, in 12 . 06 Delay Damages <br /> sive <br /> ' Paragraphs 12 .06.A and 12 .06 B have been deleted and <br /> 12 . 02 Change of Contract Times replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> A. The Contract Times (or Milestones) may only be A. 1n no event shall OAWER or EN <br /> ' changed by a Change Order or by a Written Amendment. liable + rnrrT� n rTnnany c„,., n.,-act . c, .pplie <br /> 114V1V {V VVStZZ ~, ', <br /> Any Claim for an adjustment in the Contract Times (or ^~ ^µll ' ethe1 1J �, A <br /> atio r to f et . - OF <br /> Vl LLV1JV11�J} <br /> Milestones) shall be based on written notice submitted by Yll SV {..V�^J e J1T sV FA of any of t e.y, f_ damages <br /> arising-out <br /> ZZ <br /> ' the party making the claim to the ENGINEER and the other Of OF FeStilfifig <br /> party to the Contract in accordance with the provisions of <br /> paragraph 10. 05 . 1 . delays eaused by YAidija eentr <br /> rni rrn n CT-O . „r <br /> ' B . Any adjustment of the Contract Times (or <br /> Milestones) covered by a Change Order or of any Claim for 2 . delays beyead she a Menem— of—beth <br /> an adjustment in the Contract Times (or Milestones) will be nWn.,Ev and GO-PqRAGTOR incl . ding but no <br /> determined in accordance with the provisions of this , <br /> abnormal weathe.r- <br /> Article 12 . V, Vn11V111ditiV1I., ^ , aets of god, n etseF egleet b utili+„ <br /> OF <br /> V7rllVln other- <br /> 12 . 03 Delays Beyond CONTRACTOR 's Control as eepAemplated by Aftiele 7 . <br /> ' A. Where CONTRACTOR is prevented from B . NeAift in this paragraph 12 .06 bars-a eh a ge mi <br /> completing any part of the Work within the Contract Times D <br /> aet Centf �u^e pufsuatA to this r fie' e 12 e sate <br /> c.Vaauuc{� <br /> ' (or Milestones) due to delay beyond the control of G0 T4 ? ACTOR due to delay, disruption <br /> CONTRACTOR, the Contract Times (or Milestones) will a;_eedy attributable to aeti fts , inactions „c 014WEn eF <br /> be extended in an amount equal to the time lost due to such anyO ae feFWheffl ,QA1TkM ; sible <br /> uaa v <br /> delay if a Claim is made therefor as provided in paragraph <br /> ' 12 .02.A. Delays beyond the control of CONTRACTOR <br /> shall include, but not be limited to, acts or neglect by ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> OWNER, acts or neglect of utility owners or other CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> ' contractors perforniing other work as contemplated by DEFECTIVE WORK <br /> Article 7, fires, floods, epidemics, abnormal weather <br /> conditions, or acts of God. <br /> ' 13 . 01 Notice of Defects <br /> 12 . 04 Delays Within CONTRACTOR 's Control <br /> A. Prompt notice of all defective Work of which <br /> A. The Contract Times (or Milestones) will not be OWNER or ENGINEER has actual knowledge will be <br /> ' extended due to delays within the control of given to CONTRACTOR. All defective Work may be <br /> CONTRACTOR. Delays attributable to and within the rejected, corrected, or accepted as provided in this <br /> control of a Subcontractor or Supplier shall be deemed to be Article 13 . <br /> ' delays within the control of CONTRACTOR. <br /> 13 . 02 Access to Work <br /> 12 .05 Delays Beyond OWNER 's and CONTRACTOR 's <br /> Control A. OWNER, ENGINEER, ENGINEER' s Con- <br /> sultants, other representatives and personnel of OWNER, <br /> A. Where CONTRACTOR is prevented from independent testing laboratories, and governmental agencies <br /> completing any part of the Work within the Contract Times with jurisdictional interests will have access to the Site and <br /> ' (or Milestones) due to delay beyond the control of both the Work at reasonable times for their observation, <br /> OWNER and CONTRACTOR, an extension of the inspecting, and testing. CONTRACTOR shall provide <br /> Contract Times (or Milestones) in an amount equal to the them proper and safe conditions for such access and advise <br /> time lost due to such delay shall be CONTRACTOR' s sole them of CONTRACTOR ' s Site safety procedures and <br /> and exclusive remedy for such delay. programs so that they may comply therewith as applicable. <br /> ' 00700 - 36 <br />