My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> tSC -2 . 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place : <br /> ' A . Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Engineer will call a preconstruction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the Work and to discuss schedules referred to in paragraph 2 . 05 . 13 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> ' to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> ' SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> ' A . In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 . Addenda <br /> ' 3 . Specifications <br /> 4 , Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> ' 6 . Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> ' B . Written/computed dimensions shall govern over scaled dimensions . <br /> 1 <br /> SC -4. 02 Subsurface and Physical Conditions <br /> ' SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> ' Consultants relied upon the following reports of explorations and tests of subsurface <br /> conditions at the Site : <br /> ' Report dated May 9 , 1994 , prepared by Frasier Engineering & Testing . <br /> ' SC4. 03 Differing Subsurface or Physical Conditions <br /> SC-4 . 03 . C . 3 Delete the following text from the second sentence of paragraph GC-4. 03. C. 3: <br /> ' SC -4. 06 Hazardous Environmental Conditions at Site <br /> SC-4 . 06 . G Delete paragraph GC-4. 06. G in its entirety. <br /> ' 00800 - Supplementary Conditions <br /> 008002 <br /> FAPublic Works\Capital Projects\Fourth Street-Old Dixie-USI \CONTRACT DOCUMENTS\00800 - Supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.