My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other will be considered . If the specification or description contains or is followed <br /> by words such as "equivalent" or "or-equal , " then the specification or description is <br /> intended to establish the type , function , appearance , and quality required . In such <br /> ' case , substitution of other items of material or equipment or material or equipment <br /> of other Suppliers may be submitted to ENGINEER for review under the circum- <br /> stances described below. <br /> SC-6 . 05 . A. 1 . a . ( ii ) Delete sentence GC-6. 05. A . 1 . a. (ii) in its entirety and insert the following in <br /> its place: <br /> ' ( ii ) it will reliably perform at least equally well the function of the named item of <br /> material or equipment, and ; <br /> SC -6 . 06 Concerning Subcontractors , Suppliers , and Others <br /> ' SC-6 . 06 . C . Add the following sentence at the end of paragraph GC- 6. 06. C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br /> entity, to the extent practicable , information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity. <br /> ' SC -6 . 08 Permits <br /> SC-6 . 08 Add the following paragraphs immediately after paragraph GC-6. 08. A : <br /> B . The OWNER has obtained the following permits ( copies p es of these permits are contained <br /> in Appendix "A" ) : <br /> ' 1 . FDOT Drainage Connection Permit No . 03D490 0035 <br /> 2 , FDOT Driveway Connection Permit No . 03A490-0066 <br /> 3 , SJRWMD Permit No . 40-061 -51779- 1 <br /> C . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER . <br /> D . The CONTRACTOR shall be familiar with all permit requirements and shall be <br /> responsible for complying with these requirements . The cost of this effort shall <br /> be included in the pay item in which the work is most closely associated with . <br /> E . The CONTRACTOR shall be responsible for obtaining the EPA National <br /> Pollutant Discharge Elimination System ( NPDES ) Permit <br /> ' SC -6 . 17 Shop Drawings and Samples <br /> SC-6 . 17 Add the following paragraph immediately after paragraph GC- 6. 17. F.- <br /> G . <br /> C- 6. 17. F.G . Section 01340 — " Submittal of Shop Drawings , Product Data , and Samples <br />" shall <br /> supplement Section 6 . 17 of the General Conditions . In the event of a conflict , <br /> ' Section 01340 shall govern . <br /> ' 008007 00800 - Supplementary Conditions <br /> FAPublic Works\Capital Projects\Fourth Street-Old Dixie-USI \CONTRACT DOCUMENTS\00800 - Supplementary Conditions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.