My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-103
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 1:48:24 PM
Creation date
9/30/2015 7:30:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-103
Agenda Item Number
11.I.2
Entity Name
Timothy Rose Construction
Subject
Contract and Specifications 4th St. Widening US 1 to West of Old Dixie
Project Number
9205
Bid Number
6028
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3756
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLORIDA. EAST COAST RAILWAY COMPANY <br /> SAINT AUGUSTINE, FLORIDA (-X1NG& Wr4) 04/08/03 <br /> 15 :05 <br /> VERO BEA CII; WIDEN EXISTING 44' TYPE " T" MODIFIED GRADE CROSSING TO 112 ' CONCRETE CROSSING. <br /> 4TH STREET, MILEPOST 229+3,982 AAR/DOT NO. 273049111 <br /> FILE: 229/39/3982 <br /> CROSSING DESCRIPTION PAVING DESCRIPTION <br /> New Length of Crossing Surface: 112 Tf <br /> Width (Across Road) 112 Ft <br /> Number of Tracks: I Ea Length (Along Road) 80 Ft <br /> Length of Track Panel : 152 Tf <br /> Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESC3 Fort N <br /> Responsible Party. Indian River County <br /> Agreement Date: 3 Fort Pierce Section <br /> Division of Responsibility 14 Fort Pierce Smoothing3 Crane <br /> Encase Fiber Optic Cable COUNTY 2 Loader <br /> Maintenance of Traffic COUNTY <br /> Crossing Surface COUNTY <br /> Track Materials COUNTY <br /> Track Construction COUNTY <br /> Paving COUNTY <br /> COST RECAPITULATION <br /> Track & Civil Work Item Salvage 10.00% Responsible <br /> Labor Equipment Material Contract Credit Contingency Total Party <br /> Encase Fiber Optic Cable n/a n/a n/a 92600.00 n/a 12000.00 107600.00 COUNTY <br /> Mobilization/Material Consolidation 17877.64 2,06I . 18 n/a <br /> n/a n/a 461 . 18 42400.00 COUNTY <br /> Construct Track Panel 12729.72 2,334.84 12, 875.07 n/a n/a 1 ,760.36 18,700.00 COUNTY <br /> Maintenance of Traffic/Police Protection n/a n/a n/a 222720.00 n/a 2,280.00 25,000.00 COUNTY <br /> Remove Crossing Surface 300.38 469.31 n/a n/a (675.00) 105.31 200.00 COUNTY <br /> Remove/Replace Track/Crossing Structure 37089.72 41428.39 n/a <br /> n/a (4,475.23) 357. 13 3400.00 COUNTY <br /> Line & Surface Track 851 . 82 651 . 83 43065. 80 n/a n/a 630. 56 62200.00 COUNTY <br /> Replace Crossing Surface 764.61 11194.61 302020. 80 n/a n/a 3,219.98 35,200.00 COUNTY <br /> Place Asphalt 168.50 28.45 <br /> n/a 22,680.00 n/a 27323 .06 25,200.00 COUNTY <br /> Demobilization/Site Cleanup 469.00 67.48 n/a n/a n/a 63. 52 600. 00 COUNTY <br /> Totals: 9,251 .39 117236.08 46,961 .67 55,000.00 (5, 150.23) 12,201 .09 1299500.00 <br /> TOTAL TRACK PROJECT COST: 5129,500.00 1 , 156.25 $/Ft <br /> ENGINEERING & SUPERVISION: 57180.00 <br /> TOTAL TRACK & CIVIL PROJECT COST: $134,680.00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 2849960.00 <br /> TOTAL COST TO BE BORNE BY COUNTY: #REFI <br /> $419,640.00 <br /> NOTE: THIS IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST. <br /> Medd LM Revised 7/17/97 <br /> EXHIBIT " B " <br />
The URL can be used to link to this page
Your browser does not support the video tag.